• Title/Summary/Keyword: repair scope

Search Result 56, Processing Time 0.028 seconds

Establishment of Service Life of Educational Facilities - Focused on the rooftop waterproofing and floor finishing -

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.14 no.5
    • /
    • pp.5-12
    • /
    • 2014
  • Building has been deteriorated gradually owing to geographic, physical complex and other factors. School living condition has a key role to improve the learning ability, life attitude and qualifications to adopt to social life. Therefore, it is important for school environment to keep the living condition. Repair time and scope of school facilities are required to maintain the function and performance to plan the long term repair. But there are little information about the school maintenance such as repair time and function. In this paper, it aimed at providing the service life to suggest the repair time and scope in the roof-proofing and floor finishing which used the three estimation method in probabilistic approach. The service life has a key role to decide the repair time and to make the plan for the repair maintenance. Results of this study are as follows ; First, the 1st repair time were taken through three methods in probabilistic and deterministic functions to eliminate the estimation bias. Second, the service life is suggested 36 years of an elementary school, 34 years of a middle school and 41 years of a high school. Third, the service life of a floor finishing is 43 years of an elementary, 39 years of a middle school and 41 years of a high school. The above study could not include the detailed information about the materials and repair works. Therefore it needs a further study to reflect the detailed information and to make a repair strategy.

Establishment of the Repair Cycle of the Components of the Apartment Housing

  • Lee, KangHee;Ahn, YongHan;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.14 no.2
    • /
    • pp.69-75
    • /
    • 2014
  • Building has been deteriorated over the year after construction. The deterioration has caused to hinder the living condition and to decrease the building value. Thus, it is important to prevent or delay the building deterioration as well as to proceed the maintenance. The long-term repair program for the apartment in Korea plays a key role to make the repair plan after construction and to assure the function decent. This is not flexible to the change of the material and component because the program is provided by the Korean-law. Many items are omitted in the long-term program so that the maintenance experts face many difficulties to make a repair plan. In this paper, it aimed at providing the repair cycle and repair ratio according to the repair scope, which are not provided in the current program. This study shows that the repair ratio is presented with quartile range in 25%, 50%, 75% and 100%. This has an advantage to take an overall look in repair items. Under this presentation of the repair ratio, each item has a unique repair value. Second, the repair scope is divided into partly repair, fully repair, partly alteration and fully alteration. If a fully repair has a repair ratio close to 100%, it would mean that a fully repair is a fully alteration. Third, the short repair cycle means that it requires to maintain the function or performance of the components in a short term.

Analysis of a Repair Time Preparation for the Preventive Maintenance in a Public Rental Housing Types (공공임대주택 유형별 구성재 사전예방보전 수선시기 설정연구)

  • Lee, Kang-Hee;Park, Guen-Soo;Chae, Chang-U
    • KIEAE Journal
    • /
    • v.12 no.5
    • /
    • pp.35-42
    • /
    • 2012
  • The rental housing has been a main role to supply a living space to the household who can not be available for the home-owner. Specially, the public rental housing is targeted for the low-income household and supplied with low rental fee. Therefore, the rent owner should manage and maintain the housing condition decently with a systematically maintenance plan which includes a repair time and scope, a repair cost. Among them, the repair time is important to make a repair plan. The repair time would be explained with two types, which is divided into a breakdown maintenance and a preventive maintenance. Each of them has a advantage in a repair cost, maintenance of the living condition and provision of the repair scope and method. In this paper, it aimed at providing the repair time in 12 components of the public rental housing which is reflected from a preventive maintenance. This study shows that overall, a permanent rental housing has a longer repair time than any other rental housing in 12 housing components. A public rental housing is closer to the a permanent rental housing then a redevelopment rental housing in repair time. On the other hand, the repair time of the 12 housing components is different form the rental housing. This leads to further study in difference of the repair time according to a tenant type.

Characteristics of the Economic Repair Time of the Components in Public Rental Housing

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.15 no.1
    • /
    • pp.69-75
    • /
    • 2015
  • Building has required the repair money to improve or maintain the decent living condition continuously after construction. It needs to grasp the building deterioration to decide the scope and contents before it is repaired. Under various conditions such as physical, social and financial constraints, the repair plan would be prepared. Among constraints, the cost is indispensible to specify the repair time, repair scope and target. The required cost would be planned to preparation over the years. In this paper, it aimed at providing the repair strategy of the public rental housing in repair time, using the cumulative cost model which is $3^{rd}$ function. In the $3^{rd}$ function, the inflection point should exist in the line. And there are two types in the cumulative model, First, if the maximum cost be shown, the repair time would be provided. Second, if the maximum cost not be shown, the cumulative function should be proportionally increased and the repair strategy is properly provided with a short cycle. In results of this study, 11 items would provide the repair time. These cumulative function would be repaired about 4 years after constructed, and after about 4 years, the cumulative function would be continuously increased.

Establishment of the Service Life of the Education Fcilities - Focused on the Roof water-proof and Floor finishings - (교육시설 내용년한 산정 연구 - 옥상방수와 바닥마감재를 대상으로 -)

  • Lee, Kang-Hee;Chae, Chang-U
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.24 no.6
    • /
    • pp.27-36
    • /
    • 2017
  • Educational facilities have an affect to make a decently learning environment. After constructed, it needs a maintenance plan to keep the performance or function which provide the repair time, repair scope and ratio. But the fundamental data are so insufficient that the field worker can't provide the maintenance plan and has no choice use the other data which concerned with apartment or office building. Above all, the service life is indispensible to make a repair plan because the repair time and scope would be provided within the service life. This study aimed at providing the method to make a service life of component in educational facilities and applying the method into the roof proof and floor finishing. Results are shown that first, it is important to set the $1^{st}$ repair time after constructed. when it proposes the three ways with the probability approach, choice probability model and cumulative cost function. Second, the service life of roof proof is provided with about 35 years. In addition, the service life of the floor finishing is about 40 years. These result would be utilized to conduct the repair plan under the service life.

A Study on Forecasting the Repair Time Range of the Building Components in the Apartment Housing (공동주택 구성재의 예상수선시기 범위 설정 연구)

  • Lee Kang-Hee
    • Journal of the Korean housing association
    • /
    • v.17 no.2
    • /
    • pp.19-26
    • /
    • 2006
  • Building would be deteriorated with time elapse, influenced by its geographic situation, climate and other environmental conditions. In addition, the systematic maintenance could be provided to keep the resident a recent living condition. The existing breakdown maintenance will be changed into the preventive maintenance. The preventive maintenance is required to get the repair time, the repair scope and frequency. In this paper, it aimed at providing the repair time range over the building components, utilizing the relation between the determination curve and the performance recovery through repair. Results of this study are as follows : First, the forecast of the repair time over the building components could be calculated and equalized with the deterioration and performance degree. Second, the repair time range of building components would be provided into five categories and 3rd repair time. Results of this study will set up the long-term repair plan of building, and finally keep an housing condition comfortable.

A Study on the Economic Repair Pattern of the Building Components in the Apartment Housing (공동주택 구성재의 경제적 수선형태 설정 연구)

  • Lee, Kang-Hee;Chae, Chang-U
    • Journal of the Korean housing association
    • /
    • v.17 no.5
    • /
    • pp.87-95
    • /
    • 2006
  • Building components have been deteriorated by various factors such as location, a building type, a surrounding environment and so on. In addition, each component has a peculiar characteristics, compared with other components in properties of matter an used part. Building components would be required to maintain its function and performance to provide the resident with a decent living condition. It is important to decide the repair time, scope and a required cost in repair plan, considering the each component's characteristics. In this parer, it aimed at providing the economic repair pattern to analyze the relation of the time-elapse and the cumulative repair cost in the apartment housing using 3rd quadratic function. Results of the study are as follows: First, the shape of the function for the economic repair is classified into two type. One is the continuous increase type of the cumulative cost which properly means the iterative repair type after built. The other is that the function has the maximum state at a point which means one-repair after its repair would be delayed to a scheduled time. Second, the iterative repair pattern would include window, roof proof, lighting and water supply pipe. The other repair pattern would include the paintings, heating pipe and sign board.

Effects Analysis of Governmental Research Buildings by the Main Components and Frame Repair Activities (공공 연구원 건축물의 대수선에 따른 효과분석)

  • Lee, Kang-Hee;Chae, Chang-U
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.26 no.6
    • /
    • pp.29-37
    • /
    • 2019
  • The research institute has a function to get the research outcome through the various experiments, data collection and analysis. Therefore, research building is important to keep the research condition or experiment environment. But buildings would be deteriorated and leaded into the deterrence of research. Maintenance is planned to protect the research building condition through various general repair or heavy repair. The heavy repair is generally conducted in massive repair scope or main components preparation. In this paper, it aimed at analyzing the effect of the massive or main components repair with inputted cost and its resulted output. In order to analyze the effect of a massive repair, it used the Benefit/Cost analysis and sensitivity analysis. Results of this study are as follows : The benefit/cost analysis shows that research building whose researcher continuously live and study has good effect. On the contrary, pace of the the experimental function is not good effect in benefit/cost analysis. But the experimental function is indispensible to get the research outcom for the research goal. Therefore, the experimental function will be planned to repair and get the historical repair data because the proper repair time would be prepared to cut down the repair cost.

Establishment of the Optimal Repair Cycle of the Components of the Rental Housing (공공임대주택 구성재의 적정 수선주기 산정 연구)

  • Lee, Tae-Kyoung;Chae, Chang-U;Lee, Kang-Hee
    • KIEAE Journal
    • /
    • v.12 no.5
    • /
    • pp.29-34
    • /
    • 2012
  • A rental housing has a key role to supply the living space to non-ownership. A public rental housing is particularly aimed at providing the living space for the low-income households with a low rent fee. Therefore, the local government would try to maintain the facilities of the rental housing and to get the decent living condition. For getting the required living condition, it should make a maintenance plan, which contains the repair time, repair scope and targeted component and finishings. This study is aimed at providing the optimal repair time in 12 components and components of the rental housing which is controlled by the local government. The optimal repair time has two steps to get the final result. First, it would draw the 1'st repair time with the probabilistic and empirical approach. Second, comparing the drawn data and the service life, the optima repair time would be provided with considering the components' attributes. Result are as follows : First, the optimal repair time would be considered with the component attributes. There are user's convenience, its safety and physical aspect. Second, the kitchen utensils, elevator and water tap has a optimal time of 16, 19, 17 years respectively which is considered with physical aspect. In addition, the optima repair time of the wiring appliance and lighting equipment are 12 years and 10 years respectively.

The Forecasting Model of the Repair Cost in Apartment Housing - Focused roof water proofing and Elevator work - (공동주택 공종별 수선비용 예측모델 연구 - 옥상방수 공사와 승강기 공사를 중심으로 -)

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.15 no.6
    • /
    • pp.63-68
    • /
    • 2015
  • Purpose: Most if buildings need various repair works for preventing or delaying the deterioration which gives rise to affect the living condition or function after constructed. Therefore, a long-term repair schedule should be planned and a repair cost is required. In this paper, it aimed at providing the statistical forecast model for a repair cost in roof water-proofing work and elevator work using statistical approach with three variables such as number of household, management area and a elapsed year. Data are collected in apartment housings which are located in Seoul area and conducted with interview and questionnaire sheet. Each analyzed work is divided into a partly work and fully work. Results of this study are shown that, first, the regression model takes a multiplying type like a Cobb-Douglas function and is changed into the log-linear type to include the three variable simultaneously. Second, the goodness-of-fit of the repair cost forecasting model has a good statistics in determinant's coefficient and Dubin-Watson value. Third, the management area is stronger factor than other the number of household and an elapsed year in roof water-proofing work and elevator work.