• Title/Summary/Keyword: reservoir operation

Search Result 533, Processing Time 0.027 seconds

Agricultural Reservoir Operation Analysis According to Surveyed Irrigation Guideline (현장조사 관개 기준에 따른 농업용 저수지 운영 분석)

  • Kim, Maga;Choi, Jin-Yong;Bang, Jehong;Yoon, Pu Reun;Kim, Kwihoon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.65 no.5
    • /
    • pp.37-49
    • /
    • 2023
  • The drought risk has been increasing recently due to climate change causing the extreme climate to be more frequent. In order to supply agricultural water stably under drought, it is necessary to operate an agricultural reservoir in response to drought. To this end, it is crucial to establish appropriate drought response operation rules considering weather conditions and reservoir status. In the reservoir operation simulation, the supply amount differs from the actual reservoir supply for many reasons, including maintaining water levels for supply and accommodating farmers' requests. So, for a more realistic reservoir operation simulation, it is necessary to reflect the reservoir operation rules of the actual water management site. Therefore, in this study, through a survey, the standards for limitation of agricultural water supply applied to agricultural reservoirs in Korea were investigated, and the criteria for drought response reservoir operation (DRO) were established based on the survey. Then, the DRO was applied to the irrigation period for nine subject reservoirs. The applicability was evaluated by comparing the DRO result to the operation result of HOMWRS (Hydrological Operation Model for Water Resources System). The reservoir drought index, storage rate, and daily supply were compared for evaluation. From the result, DRO showed more stable operation results in most cases against drought as it has fewer days of water supply limitation and a somewhat reservoir storage rate which can be utilized for prolonged drought.

Reservoir Operation at Flood Time by Transformed Reservoir Flood(TRF) Reservoir Operation Method(ROM) (저수지 홍수변환법에 의한 홍수시 저수지 운영)

  • Gwon, O-Ik;Sim, Myeong-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.1
    • /
    • pp.105-113
    • /
    • 1998
  • Reservoir operation during flood period can be divided into two parts: One is for an operating policy during flood period to consider water conservation and flood control, and the other is for flood time on a random water level at flood forecasting, This study is concerned with reservoir operation and discusses general reservoir operation at flood time. Flood control has problems such as the uncertainty of hydrologic models. technical limitations and some constraints. Therefore, we may prepare the quantitative flood control methods based on the assured flood control storage for reservoir operation. Transformed Reservoir Flood(TRF) Reservoir Operation Method(ROM) is a procedure which determines the adequate releases with considering dam safety for flood inflows over non-damaging discharge. Based on the TRF ROM which was explained in our published paper. the study discusses the TRF ROM with additional investigations and the general reservoir operation rules at flood time.

  • PDF

Optimal Reservoir Operation Models for Paddy Rice Irrigation with Weather Forecasts(Ill) -Model Application- (기상예보를 고려한 관개용 저수지의 최적 조작 모형(III) -모형의 적용-)

  • 김병진;박승우;정하우
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.36 no.3
    • /
    • pp.47-59
    • /
    • 1994
  • The irrigation reservoir operation models developed were tested with weather and field data, and the sensitivity of the water requirement deficiency indices(WRDI) were checked with different initial reservoir storages, irrigated areas, and other water uses from the reservoir storage. Seven reservoir release rules were applied to Yongseol Reservoir. Twenty year WRDIs were computed to check performances of those reservoir release rules. Mean WRDIs were 138, 198, 198, 200, 240, 344, and 1033mm for ROM, TOS, COS, CRR, MSC, FAS, and SRC, respectively. The results indicated that ROM contributes consistently to higher operation efficiencies of an irrigation reservoir. The test results of LFROM and SFROM showed that reservoir operation with the proposed optimization technique ROM would be better suited for an irrigation district than those with the other rules. And the proposed model could be used as a tool to improve reservoir operations.

  • PDF

Operation Rule Curve for Reservoir with Low Areal Ratio of Watershed to Downstream Paddy Field (유역배율이 작은 저수지의 이수관리방법)

  • Noh, Jae-Kyoung
    • KCID journal
    • /
    • v.18 no.1
    • /
    • pp.68-80
    • /
    • 2011
  • To provide a operation rule curve for reservoir with low ratio of watershed area to paddy field area, Duckyong reservoir with watershed area of $15.8km^2$ and paddy field area of 1,071ha was selected, in which 4 meters are being heightened and full water levels will be increased from EL.26.0m to EL.30.0m, total water storages from 365.6M $m^3$ to 708.0M $m^3$. There was no operation rule curve that satisfied over 90% reliability of water supply in reservoir with watershed area of 1.48 times of paddy field area. The differences between observed and simulated reservoir daily water storages were minimized to determine parameters for simulating reservoir inflow in case of paddy field area of 550ha from 1991 to 2010. A operation rule curve was drawn to have a maximum storage with total water storage, which was in paddy field area of 700ha with ratio of 2.3 between watershed area and paddy field area. This case showed that annual irrigation water supply was 668M $m^3$ and instream flow of 57M $m^3$, water supply reliability of 55.6% in normal operation, and annual irrigation water supply was 605M $m^3$ and instream flow of 38M $m^3$, water supply reliability of 95.6% in withdrawal limited operation. Water supply reliabilities showed 35.6% without flood regulation and 17.8% with flood regulation in existing reservoir before heightening.

  • PDF

Improvement for Reservoir Operation Module of Flood Forecasting-Warning Systems in Han River (한강 홍수예경보시스템의 저수지 운영모듈 개선)

  • Kwon, Oh-Ig;Kim, Sung;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.6
    • /
    • pp.685-695
    • /
    • 1999
  • On the premise of flood control procedure, flood forecasting-warning, system(FFWS) is one of actions for disaster prevention. It makes public announcements for flood situations timely in order to mitigate damage from floodings. Multi-purpose dam which has flood control storage plays an important role in river basin at flood time. In FFWS, it is reservoir operation module that is related to reservoir operation of multi-purpose dam. This study considers the current conditions and problems in reservoir operation module of FFWS in Han River and improves reservoir operation module under limited research scope. As results, additional reservoir operation modules such as Technical ROM(Reservoir Operation Method) and ARD(Approved Release Discharge) ROM were built in FFWS. Using these newly built reservoir operation modules. Han River Flood Control Office will plan and work for flood control and flood forecasting. Firstly, it may plan for flood control by Technical ROM which is deterministic simulation model, and work for final flood control and flood forecasting by ARD ROM according to approved release discharge afterward.

  • PDF

Analysis of Operation Plan by Multipurpose Supply for Heightened Agricultural Reservoir (둑높임저수지 다중용수공급에 따른 운영 방안 분석)

  • Kim, Hae Do;Lee, Kwang Ya;Park, Jong Yoon;Han, Guk Heon;Lim, Heung Chang
    • KCID journal
    • /
    • v.19 no.1
    • /
    • pp.77-86
    • /
    • 2012
  • The aim of this study was to analyze the operation plan for heightened agricultural reservoir, in terms of water supply to downstream paddy fields and instreams. Operation of agricultural reservoir before the heightened reservoir project is easy to manage because of its single purpose, which is irrigation water supply. However, after proceeding the heightened project, there is needed to be set the operation rule because of its multiple purpose, which is water for irrigation and supply to the stream. In this paper, propose the method of design the criteria of supply to the stream and operation rule curve for the heightened reservoir. According to simulation results by proposed operating rule for the Gumsa reservoir, the yearly amount of water supply to the stream can be 2,588 thousand $m^3$, 3 times of the heightened space (2,588 thousand $m^3$).

  • PDF

Reservoir Operation by Drought Forecasting and Warning (가뭄 예ㆍ경보에 의한 저수지 운영에 관한 연구)

  • Yi, Jae-Eung;Kim, Young-A
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.10
    • /
    • pp.837-844
    • /
    • 2004
  • In this study, the efficient reservoir operation is studied by comparing results from reservoir operation using a basin drought forecasting and warning system with an existing reservoir operation rule. As a result, it is found that the reliability and average annual storage of reservoir operation using a basin drought forecasting and warning system and release coefficients is better than those of reservoir operation using the existing operation rule. The release coefficients for Yongdam dam located in the Geum river basin selected as a case study are found to be the most effective for the value of 0.95 for the drought watch, 0.9 for the drought warning and 0.85 for the drought emergency. The reservoir operation using a drought forecasting and warning enables the use of the limited water resources effectively during drought and will contribute the national water resources management.

Affecting Water Supply Capacity Followed by Allocating Flood Control Volume in Heightening Reservoir (홍수조절용량 설정에 따른 증고저수지의 용수공급능력 변화)

  • Noh, Jae-Kyoung
    • KCID journal
    • /
    • v.17 no.2
    • /
    • pp.57-70
    • /
    • 2010
  • This study was performed to analyze the affect of water supply capacity followed by allocating flood control volume in heightening reservoir, of which Baekgog reservoir was selected as a case study in here. Baekgog reservoir is located in Jincheon county, Chungbuk province, of which full water level will be heightened from EL. 100. 1m to EL. 102.1m, and total storage from 21.75M $m^3$ to 26.67M $m^3$. Flood inflow with 200year frequency was estimated to 997 $m^3$/s in peak flow and 22.54M $m^3$ in total volume. Reservoir flood routing was conducted to determine flood limited water levels, which was determined to have scenarios such as EL 97-98-99m in periods of 6.21.-7.20., 7.21.-8.20., and 8.21.-9.20., respectively, EL 97-97-97m, EL 98-98-98m in present reservoir, and EL 99-100-101m, EL 99-99-99m, and EL 100-100-100m in heightened reservoir. Reservoir inflow was simulated by DAWAST model. Annual paddy irrigation requirement was estimated to 33.19M $m^3$ to 2,975ha. Instream flow was allocated to 0.14mm/d from October to April. Operation rule curve was drawn using inflow, irrigation and instream flow requirements data. In case of withdrawal limit reservoir operation using operation rule curve, reduction rates of annual irrigation supply before and after flood control by reservoir were 2.0~4.3% in present size and 1.5~3.6% in heightened size. Reliability on water supply was decreased from 77.3% to 63.6~68.2% in present size and from 81.6% to 72.7~79.5% in heightened size. And reduction rates of water storage at the end of year before and after flood control by reservoir were 7.3~16.5% in present size and 7.7~16.9% in heightened size. But water supplies were done without any water deficiency through withdrawal limit reservoir operation in spite of low flood regulating water level.

  • PDF

Development of Operation Rules in Agricultural Reservoirs using Real-Time Water Level and Irrigation Vulnerability Index (실시간 저수위 및 용수공급 취약성 지표를 활용한 농업용 저수지 운영 기준 개발)

  • Nam, Won Ho;Choi, Jin Yong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.55 no.6
    • /
    • pp.77-85
    • /
    • 2013
  • The efficient operation and management strategies of reservoirs in irrigation periods of drought events are an essential element for drought planning and countermeasure. Korea Rural Community Corporation has developed the real-time water level observation system of agricultural reservoirs to efficiently operate reservoirs, however, it is not possible to predict drought conditions, and only provides information of current situation. Hence, it is necessary to evaluate accurate irrigation vulnerability and efficiently reservoir operation rules using current water level. In this paper, the improvement methods of reservoir operation planning were developed with water supply vulnerability characteristic curves comparing to automatic water gauge at agricultural reservoirs. The 11 reservoirs were simulated applying the reservoir operation rules which was determined by irrigation vulnerability characteristic curves criteria and real time water level, and evaluated water supply situation in 2012 year. The analysis of results can be identified probabilistic possibility of water supply failures compared with the existing reservoir operation criteria. These results of efficient reservoir operation rules can be achieved enable irrigation planners to optimally manage available water resources for decision making, and contributed to maintain the water supply according to demand strategy for agricultural reservoirs management.

Operation rule curve for supplying urban instream flow from reservoir (도시 하천유지유량 공급의 저수지 운영 방법)

  • Noh, Jae-Kyoung;Lee, Jae-Nam
    • Korean Journal of Agricultural Science
    • /
    • v.38 no.1
    • /
    • pp.163-172
    • /
    • 2011
  • To provide the operation rule curve for suppling instream flow to urban stream from reservoir, the Soho reservoir with watershed area of 7.4 $km^2$ and total water storage of 2.58 $Mm^3$ was planned at the headwaters of the Daejeoncheon. Daily streamflow was simulated and using the simulated streamflow and desired instream flow, the operation rule curve by Senga method was drawn and evaluated through reservoir operation. Senga method is derived by accumulating the differences between streamflow and desired instream flow adversely. Water storages were simulated on a daily basis to supply urban instream flow from Soho reservoir, but the amount of supplying instream flow to urban stream was not nearly increased comparing with that of normal operation that does not used the rule curve. Thereafter the new simulation-based operation rule curve was derived and applied to supply instream flow from Soho reservoir. In normal operation, the amount of instream flow was shown to 15,000 $m^3$/d, but it was increased to 27,700 $m^3$/d in withdrawal limited operation using the new derived rule curve, in which the applicability of this rule curve was proved. Also comparing with the flow duration curves at station just before urban Daejeoncheon stream without and with upstream Soho reservoir, the 95th flow was decreased from 1.64 mm/d to 1.51 mm/d, and the 355th flow was increased from 0.17 mm/d to 0.30 mm/d. Monthly streamflows during October to March were increased from 10.6~24.1 mm to 24.1~34.0 mm with the increasing rate of 141~227%.