• Title/Summary/Keyword: scheduling

Search Result 4,868, Processing Time 0.031 seconds

Study on Optimal Appointment Pattern using Plastic Surgery Appointment Data (성형외과 예약 고객 데이터를 반영한 최적 예약 패턴 연구)

  • Choi, Jiyeon;Chung, Yerim
    • Korea Journal of Hospital Management
    • /
    • v.23 no.3
    • /
    • pp.87-103
    • /
    • 2018
  • Purpose: This study investigates the best appointment pattern which can enhance customer's satisfaction and hospital's efficient management reflecting plastic surgery clinic's service characteristics. Methodology: The data of this study is obtained from Plastic surgery Clinic which is located in the civic center. By collecting and analyzing the data, we build the simulation model using ARENA. Based on 5 appointment patterns that was suggested in formal appointment scheduling studies, we experiment 3 simulation models; 'Basic Appointment Pattern' that has no restriction, 'Restriction on Second Customer' that restricts the number of second customer's in each slot, 'Restriction on Process Time' that restricts the number of second customer who has long process time in each slot. We can check robustness of the appointment patterns by experimenting on off-peak day and peak day, during peak season. Findings: This study confirms that these 2 restrictions can give a better result than 'Basic Appointment Pattern' that just simply distributes customers by number. Especially, the performance of Triangle-like pattern which is the best appointment pattern in the formal study has been improved by adding restrictions. Based on 'DET', 'Restriction on Second Customer' shows a better result. Meanwhile, based on 'E(WT)', 'Restriction on Process Time' shows a better result. Overall, based on 'DET+E(WT)', 'Restriction on Second Customer' shows a better result. Practical Implications: The purpose of each hospital may alter as demand for plastic surgery grows increasingly. Thus, each hospital should be always prepared to introduce appointment pattern for changed purpose. In order to respond flexibly to these changes, it is necessary for medical personnel to improve the awareness or for hospital to create an environment by constructing appointment program so that medical personnel does not need to put more labor on work.

Research on the Strategy for Outsourcing in Construction Projects: in Fast-track Project (건설프로젝트에서 전략적 하도급 방안에 관한연구 : 설계시공병행방식 사례를 중심으로)

  • Choi, Soo-Ho;Choi, Hyun-Chul;Choi, Hye-Mi;Kim, Ju-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.551-559
    • /
    • 2014
  • Fast-tracking was developed as an optimizing method to shorten the duration of construction project in 1960's, and it introduced to Korea in 1999. Since then, many Korean companies have been used fast-tracking for getting economical benefit from shorten duration. However, there were some problems(dispute, delay and cost overrun) because of using inappropriate subcontractor management system. For this reason, previous studies suggested some management models to solve these problems. Unfortunately, however, the models have been had some doubts about reliability, objectivity and possibility of using them on real construction site. Therefore, this study suggests 3 steps of strategic subcontracting method and apply it on real fast-tracking practice(L company) to secure reliability and objectivity. Through this, the method is expected to make up the doubts of previous studies.

A method of Calculating Optimal Duration and Cost Using Monte Carlo Simulation and Linear Programming (몬테카를로 시뮬레이션과 선형계획법을 이용한 최적의 일정 및 비용 산정방법)

  • Kim Yong-Deuk;Lee Young-Dae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.210-215
    • /
    • 2004
  • In can occur to many problems on progressing step without close scope definition, interrelation definition between activities, resource plan, and schedule plan on planning step. But it have not closely defined performance system on planning step because of many constraints of domestic construction industry. Therefore this paper intends to discuss a method of calculating optimal cost and duration using Linear Programming that solves maximing or minimizing problems among decision making methodology and Monte Carlo Simulation that decreases to probability errors. With outcoms applying Linear programming and Monte Carlo Simulation for calculating optimal cost and duration, follow as : With outcomes applying Monte Carlo Simulation, it could calculate reliable estimator about project duration through removing various constraints. With outcomes applying Linear programming, it could calculate optimal value about project cost through defining various variables and constraints on many activities.

  • PDF

An Administration Model for Causes of Delay in Construction Projects to Decide Time Extension Responsibility (건설공사 공기연장 책임구분을 위한 지연사유 관리 모델)

  • Kim, Jong-Han;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.31-41
    • /
    • 2011
  • Since the cases of time extension have continuously transpired in the public construction project, the potential of economical loss and claims is increasing because the concerned parties such as an owner or a contractor have not properly performed their own responsibility for time extension. One of the main reasons is that the present planning and scheduling do not support the method to apportion the proper responsibility to the right party. This problem has repeatedly led to time extension and made it difficult for the concerned parties to perform the responsibility for time extension. In order to overcome this problem, a framework of delay administration is required as the method to apportion the proper responsibility to the right party. To solve this problem, this paper aimed to develop the conceptual model and prototype system as the practical method to administrate delay causation. Furthermore, the verification result for the reliability and applicability throughout the case studies on real construction projects shows that the conceptual model and prototype system developed would help efficiently to administrate the delay causation.

Estimation of Project Duration by Probabilistic Linkage Evaluation Technique (PLET) (확률적 연결관계 평가기법(PLET)에 의한 사업공기 추정)

  • Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.44-52
    • /
    • 2014
  • Generally, the most difficult works at scheduling are to estimate the duration of activities and linkages between them because the possibility that the duration and linkages could be exposed to the uncertainties is so high. When estimating a project duration, therefore, the probabilistic estimation of the duration as well as the probabilistic estimation of the linkages between activities should be considered concurrently. The PERT that is one of the most popular techniques applied for the probabilistic estimation of a project duration can not consider the uncertainties of the linkages because it only estimates the probabilistic duration limited to 'FS0' relationship. The purpose of this study is to propose the new method "PLET" for stochastically estimating the project duration based on the probabilistic estimation of the BDM's relationships, and also provide more wide and various probabilsitic information about the project duration by it.

Capacity Evaluation of VoIP Service over HSDPA with Frame-Bundling (HSDPA 시스템에서 Frame-Bundling을 채용한 VoIP 서비스 용량 평가)

  • Hwang, Jong-Yoon;Kim, Yong-Seok;Whang, Keum-Chan
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.32 no.3B
    • /
    • pp.161-167
    • /
    • 2007
  • In this paper, we evaluate the capacity of voice over internet protocol (VoIP) services over high-speed downlink packet access (HSDPA), in which frame-bundling (FB) is incorporated to reduce the effect of relatively large headers in the IP/UDP/RTP layers. Also, a modified proportional pair (PF) packet scheduler design supporting for VoIP service is provided. The main focus of this work is the effect of FB on system outage based on delay budget in radio access networks. Simulation results show that VoIP system performance with FB scheme is highly sensitive to delay budget. We also conclude that HSDPA is attractive for transmission of VoIP if compared to the circuit switched (CS) voice that is used in WCDMA (Release'99).

Tosufloxacin Tosylate Increased the Liver Enzyme Levels in a Bladder Cancer Patient with Normal Liver Functions: a Case Report (정상 간기능을 가진 방광암환자에서 간효소 수치를 올리는 Tosufloxacin Tosylate: 증례보고)

  • Choi, Eun Joo;Song, In Ja;Rhew, Ki Yon;Yoon, Hyonok
    • Korean Journal of Clinical Pharmacy
    • /
    • v.25 no.1
    • /
    • pp.56-58
    • /
    • 2015
  • Summary: We report the first hepatic adverse effect of tosufloxacin tosylate in a muscle invasive bladder cancer patient with normal liver functions and with scheduling to undergo a surgical operation for a neobladder. Tosufloxacin tosylate 150 mg was administered to a 57-year-old man who maintained transurethral resection of bladder tumor (TUR-BT) postoperative multiple medications. His labs presented significant increases in alanine amino transferase (ALT) and aspartate amino transferase (AST) levels with 2-week compliance of 150 mg tablet three times a day. After discontinuing tosufloxacin tosylate, the levels slowly decreased and completely returned to normal ranges without any intervention in a few weeks. The Naranjo Causality Algorithm indicates a probable relationship between increased ALT and tosufloxacin. The patient was to have the second surgical operation as scheduled after getting normal range of ATL level. Therefore, tosufloxacin should be avoided in patients at risk for having liver dysfunctions or diseases if the patients have a schedule for any operation. Background: Tosufloxacin tosylate has been shown to have favorable benefits as an antibiotic. Tosufloxacin tosylate may be considered to have the adverse effects such as nauseas, vomiting, diarrhea, abdominal pain, stomatitis, tendonitis, tendon rupture, headache, dizziness, drowsiness, insomnia, weakness, agitation including hemolysis in the event of glucose-6-phosphate dehydrogenase deficiency as other fluoroquinolones. More severe adverse reactions of tosufloxacin tosylate over the above common adverse effects of fluoroquinolones were thrombocytopenia and nephritis. It also is not well known that tosufloxacin can cause hepatic problem. Here the study reports the first hepatic reaction from tosufloxacin and might arouse heath care providers' attention to appropriate drug choice for patients.

Game Theoretic Analysis for RFID Reader Collision (RFID 리더 주파수 간섭에 대한 게임 이론 관점에서의 해석)

  • Lee, Dong-Yul;Lee, Chae-Woo
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.46 no.5
    • /
    • pp.36-47
    • /
    • 2009
  • There exists RFID reader-to reader frequency which can not recognize tag in dense reader nude because the interference causes low SIR. To solve this frequency, the many algorithms based on TDM have been proposed. But the most of existing algorithms not obtain the optimal time allocation but propose heuristic scheduling algorithm. In this paper, we apply game theory which deals with interest between players of game to RFID reader-to reader interference and analyze the time allocation problem of reader based on TDM in terms of cooperative game which the players bind agreements using Nash Bargaining Solution(NBS) and non-cooperative game which the players do not bind agreements using Nash Equilibrium(NE). The applied results show that in dense reader mode, NBS of cooperative game is superior to NE of non-cooperative game and present optimal time allocation in dense reader mode.

Full-Search Block-Matching Motion Estimation Circuit with Hybrid Architecture for MPEG-4 Encoder (하이브리드 구조를 갖는 MPEG-4 인코더용 전역 탐색 블록 정합 움직임 추정 회로)

  • Shim, Jae-Oh;Lee, Seon-Young;Cho, Kyeong-Soon
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.46 no.2
    • /
    • pp.85-92
    • /
    • 2009
  • This paper proposes a full-search block-matching motion estimation circuit with hybrid architecture combining systolic arrays and adder trees for an MPEG-4 encoder. The proposed circuit uses systolic arrays for motion estimation with a small number of clock cycles and adder trees to reduce required circuit resources. The interpolation circuit for 1/2 pixel motion estimation consists of six adders, four subtracters and ten registers. We improved the circuit performance by resource sharing and efficient scheduling techniques. We described the motion estimation circuit for integer and 1/2 pixels at RTL in Verilog HDL. The logic-level circuit synthesized by using 130nm standard cell library contains 218,257 gates and can process 94 D1($720{\times}480$) image frames per second.

Improved Simulated-Annealing Technique for Sequence-Pair based Floorplan (Sequence-Pair 기반의 플로어플랜을 위한 개선된 Simulated-Annealing 기법)

  • Sung, Young-Tae;Hur, Sung-Woo
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.46 no.4
    • /
    • pp.28-36
    • /
    • 2009
  • Sequence-Pair(SP) model represents the topological relation between modules. In general, SP model based floorplanners search solutions using Simulated-Annealing(SA) algorithm. Several SA based floorplanning techniques using SP model have been published. To improve the performance of those techniques they tried to improve the speed for evaluation function for SP model, to find better scheduling methods and perturb functions for SA. In this paper we propose a two phase SA based algorithm. In the first phase, white space between modules is reduced by applying compaction technique to the floorplan obtained by an SP. From the compacted floorplan, the corresponding SP is determined. Solution space has been searched by changing the SP in the SA framework. When solutions converge to some threshold value, the first phase of the SA based search stops. Then using the typical SA based algorithm, ie, without using the compaction technique, the second phase of our algorithm continues to find optimal solutions. Experimental results with MCNC benchmark circuits show that how the proposed technique affects to the procedure for SA based floorplainning algorithm and that the results obtained by our technique is better than those obtained by existing SA-based algorithms.