Development of Prediction Model of Subcontract's Bidding-Ratio for Private Apartment Projects (민간 공동주택 하도급 낙찰률 예측모델 개발)

  • Jang, Ki-Suk;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.250-251
    • /
    • 2021
  • A subcontract work order is the basis of the construction process and consists of the root and trunk of the construction industry. The construction process through a subcontract work order is an important element of project success, and it is the basic unit of creating profit in the construction industry. Therefore, correct analysis and forecasting of subcontract work orders allow correct estimation of construction cost and profit which is the foundation of corporate decision making. This study has started to provide predictions of subcontractor's bidding-ratio for decision-making. Since the actual project data has been used in this study, the contribution level of the model is highly expected in actual field. The statistical confidential level of adjusted decision coefficient is concluded low because of limited sample numbers. However, its accuracy and confidence level can be increased through increasing sample numbers, considering more variables, and studying of reducing error.

  • PDF

The Corresponding Plan for Integrated Environment-the Lowest Cost Bid and The Current Cost Estimate System (최저가입찰제 및 실적공사비적산 환경에서의 대응방안)

  • Kim, Byeong Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.849-859
    • /
    • 2006
  • Earnings of domestic enterprises are expected a serious damage because the lowest cost bid system and the current cost estimate system. In 2005 average successful bid rate for the lowest cost bid project is below 60%, this is not reach at the operating budget of enterprise. Many problems such as illegal construction, low price subcontract, chain enterprise loss com in to practice because of low successful bid rate. In addition earnings of the enterprises expected to be the minimum, because of enlarge execution of the current cost estimate system. This study tries to lend assistance by giving alternative for the construction enterprise by presenting the bid system, investigate and compare foreign system with domestic and analyze correlation of the lowest cost bid and the current cost estimate system.