• 제목/요약/키워드: subway concrete box structure

검색결과 17건 처리시간 0.029초

대기온도를 고려한 지하철 콘크리트 Box 구조물의 수화열에 의한 온도균열제어 대책 (A Counterplan of temperature crack control by a heat of hydration of Subway concrete box structure concerned External Temperature)

  • 노현섭;김은겸;양신추
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.581-584
    • /
    • 2007
  • The subway concrete box structure can`t establish expansion joint because of animal power delivery of the subway rail. In this case, As increase of structure volume, it is subjected to cause temperature crack. The temperature crack due to the heat of hydration classified a nonstructural crack. but it has a bad effect on durability of concrete structures. especially, in case of a subway concrete box structure, when a water-proof facilities is beaked on an outer-wall, the water leakage occurs through a penetration crack generated from a wall of the concrete structure too. This paper, for the subway concrete box structure, examined a condition of temperature crack occurrence by a heat of hydration concerned external temperature from analysing by a three dimensional finite element method.

  • PDF

콘크리트 BOX 구조물의 수화열에 의한 온도균열제어 대책 (A Study on Minimizing for Hydration Heat Cracks of a Subway Concrete Box Structure)

  • 김은겸;전찬기;전중규;배상일
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2006년도 추계 학술발표회 논문집
    • /
    • pp.705-708
    • /
    • 2006
  • The bigger of concrete structures by a construct technique improvement, and the increase of the cement quantity which is caused by with use of the high-strength concrete for the load-carrying-capacity and a durability cause temperature cracks by a heat of hydration. The temperature crack due to the heat of hydration classified a nonstructural crack. but it has a bad effect on durability of concrete structures. especially, in case of a subway concrete box structure, when a water-proof facilities is beaked on an outer-wall, the water leakage occurs through a penetration crack generated from a wall of the concrete structure too. This paper, for the subway concrete box structure, which is located in chloride attack region, the use of blended cement, the temperature of air and concrete, was considered and analysed by a three dimensional finite element method.

  • PDF

지하철 콘크리트 BOX 구조물의 수화열에 의한 균열저감 대책 연구 (A Study on Minimizing for Hydration Heat Cracks of a Subway Concrete Box Structure)

  • 김은겸;윤석구;배상일;정재용;김현철;허정옥
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2006년도 춘계 학술발표회 논문집(II)
    • /
    • pp.425-428
    • /
    • 2006
  • The bigger of concrete strctures by a construct technique improvement, and the increase of the cement quantity which is caused by with use of the high-strength concrete for the load-carrying-capacity and a durability cause temperature cracks by a heat of hydration. The temperature crack due to the heat of hydration classified a nonstructural crack. but it has a bad effect on durability of concrete structures. especially, in case of a subway concrete box structure, when a water-proof facilities is beaked on an outer-wall, the water leakage occurs through a penetration crack generated from a wall of the concrete structure too. This paper, for the subway concrete box strucuture, the use of blended cement, the temperature of air and concrete, control joint, was considered and analysed by a three dimensional finite element method.

  • PDF

지하철 콘크리트 BOX 구조물의 수화열에 의한 온도균열 제어 방안 연구 (A Study for Control of Thermal Cracking by Heat of Hydration in Subway Concrete Box Structure)

  • 송석준;유상건;박지웅;김은겸
    • 한국철도학회논문집
    • /
    • 제12권6호
    • /
    • pp.1024-1029
    • /
    • 2009
  • 콘크리트 구조물의 대형화에 따라 시공 중 수화열에 의한 온도 균열 발생 사례가 증가하고 있다. 지하철 콘크리트 BOX 구조물의 경우, 부재 두께가 1m 이상 되는 경우가 대부분이며, 특히 벽체는 외부구속에 의한 관통균열 발생으로 누수 및 조직 열화가 발생하여 내구성에 나쁜 영향을 주고 있다. 지하철은 일반적으로 도로를 따라 건설되므 로 교통체증을 줄이기 위한 공사기간 단축 시도가 종종 발생하게 된다. 본 연구에서는 공사시간 단축 방안으로서 한 지간씩 건너띠면서 콘크리트를 타설하는 시공방법을 제안하였으며, 이에 대한 온도균열제어에 미치는 영향을 검토하였다. 또한 벽체 높이, 타설온도, 대기온도 등을 현장조건에 따라 변화시켜 온도균열에 대한 민감도 분석을 실시하였다.

철근 콘크리트 구조물의 모델거동에 관한 연구 (Model Analysis of Reinforced Concrete Structure)

  • 오병환;김배식;이명규;전세진;김광수
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1995년도 가을 학술발표회 논문집
    • /
    • pp.193-197
    • /
    • 1995
  • Computer-based methods have often been used in the structural analysis. But, regardless of the progress in the technique of structural analysis, there are inevitable limitations in consideration of the material and eometric nonlinearity and prediction of failure loads. Model analysis of concrete structure can supplement this kind of limitations to reasonably predict behavior of the structure. Similitude requirement in the reinforced concrete structure is often hard to be secured because of peculiar uncertainty of concrete. In this study, small scale model of subway box structure was constructed using strength model and results of model of subway box structure was constructed using strength model and results of model test and computer-based analysis were compared.

  • PDF

지하철 콘크리트 BOX구조물의 내구성설계에 대한 연구 (A Study of Durability Design in the Subway Concrete Box Structure)

  • 권영찬;김은겸
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.940-956
    • /
    • 2004
  • In the course of studying the design of securing the 100-year-long durability of 100 years the subway structure according to the requested service by the Seoul Metropolitan Subway Construction Headquarters, we analyzed 14 construction sites adopting the durability design in subway line No. 9 and concluded as follows: 1. When comparing with 158, the environment index presented for securing 100-year-long durability of subway structure in subway line No. 9, the index of durability was verified as 159.7$\~$179.8 2. When examining the increase value of durability index, we verified that the constructors didn't make various choices in method but they employed the uniformly selected system. 3. Under consideration of the bid form, the construction under bid contract in bulk gave the impacts on the construction cost with attention to selection of the durability index, while the construction under alternative contract in bid adopted uniformly the standard presented by the ordering party.

  • PDF

철근부식으로 인한 지하철 박스구조물의 콘크리트 피복층 균열특성 분석 (Analysis of Crack characteristic on Concrete Cover for Subway Box Structure Due to Reinforcement Corrosion)

  • 최정열;신동섭;정지승
    • 문화기술의 융합
    • /
    • 제8권6호
    • /
    • pp.727-732
    • /
    • 2022
  • 도시철도 지하구조물에서 중요한 열화 중 하나인 철근부식은 철근의 부피 팽창에 의해 콘크리트의 피복층의 균열 또는 표면박리, 박락 등을 초래하여 철근콘크리트 구조물의 사용성과 안전성이 저하된다. 본 연구에서는 부식환경에서의 도시철도 지하박스 구조물을 대상으로 철근부식으로 인한 콘크리트 피복층의 균열발생 위치에서 철근의 팽창율을 측정하고 이를 바탕으로 철근부식으로 인한 콘크리트 피복층 들뜸 및 손상에 대한 분석을 수행하였다. 부식된 철근의 방사형 변위 분포 모델을 산출하고 기존 제안식과 비교, 분석하였다. 또한 대표 단면을 대상으로한 수치해석(역해석)을 수행하여 부식철근의 방사형 변위장에 의한, 철근의 불균일한 부식팽창을 해석모델에 적용하였다. 수치해석 결과를 바탕으로 철근부식율 진전에 따른 철근콘크리트 구조물의 균열 및 피복층 박리의 영향을 해석적으로 도출하고 현장 시료와의 비교를 통해 수치모델의 적정성을 입증하였다.

지하철 박스 구조물에서의 온도균열제어 (Temperature Crack Contol in Subway Box Structures)

  • 구본창;김동석;하재담;김기수;최롱;오병환
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1999년도 봄 학술발표회 논문집(I)
    • /
    • pp.293-298
    • /
    • 1999
  • The crack of concrete induced by the heat of hydration is a serious problem, particularly in concrete structures such as underground box structure, mat-slab of nuclear reactor buildings, dams or large footings, foundations of high rise buildings, etc.. As a result of the temperature rise and restriction condition of foundation, the thermal stress which may induce the cracks can occur. Therefore the various techniques of the thermal stress control in massive concrete have been widely used. One of them is prediction of the thermal stress, besides low-heat cement which mitigates the temperature rise, pre-cooling which lowers the initial temperature of fresh concrete with ice flake, pipe cooling which cools the temperature of concrete with flowing water, design change which considers steel bar reinforcement, operation control and so on. The objective of this paper is largely two folded. Firstly we introduce the cracks control technique by employing low-heat cement mix and thermal stress analysis. Secondly it show the application condition of the cracks control technique like the subway structure in Seoul.

  • PDF

하천통과 지하구조물의 누수 보수 대책 (A Case Study on Repairing Work of Leakage of River-crossing Underground Structure)

  • 이종은;최석원;노현창
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2000년도 가을 학술발표회논문집(I)
    • /
    • pp.801-809
    • /
    • 2000
  • Until recently as a method of repairing leaking problem, generally urethane series were used for many structures as subway, box culvert etc. However the lacking of sufficient penetration capacity have made it difficult to repair such structures completely. Now, we could achieve enhanced quality of repairing work by using new material which was compounded of urethane series and cement series properly. This material can penetrate concrete structure efficiently and move interactively with the structure in case of the thermal expansion. Besides of this, we could prevent expecting leakage through several improvements on the aspects of design, materials and site implementation.

  • PDF

지하박스구조물 온도균열제어를 위한 시공방안연구 (A Study on the Construction Method for the Thermal Crack Control of Underground Box Structure)

  • 오병환;유성원;김의성;전세진
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1998년도 봄 학술발표회 논문집(I)
    • /
    • pp.205-210
    • /
    • 1998
  • The strength and dimension of recent constructed subway box structures are increased considerably. These increases are resulting in much initial cracks by hydration heat and thermal stress. According to previous studies, decrease of cement amount by using superplasticizer and L/H value is the best way to eliminate hydration heat and stress. The analyses using finite element model were performed. By the result of analysis, the use of superplasticizer and the decrease of the change of longitudinal placing length are proved to be more effective for elimination thermal cracks. By ACI Code, for longitudinal placing length 25 m, the amount of wall temperature reinforcement is always lack despite of concrete mix proportion. With analytical result and the inducing crack joint, the in-site test were performed and the analytical results proved to be effective. However, the inducing crack joint is not effective if it is a small size.

  • PDF