• Title/Summary/Keyword: super-block curtain wall

Search Result 1, Processing Time 0.015 seconds

Construction of Super-block Unit Curtain Wall for High-rise Buildings Utilizing a Specialized Installing Equipment (전용 양중틀을 활용한 초고층 건물의 슈퍼블럭 유닛 커튼월 시공)

  • Chung, Sam-Yong;Lee, Sang-Heon;Ohk, Young-Mu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.174-181
    • /
    • 2004
  • We will introduce a method of construction of super-block curtain wall applied to Tower Palace III which is the highest high-rise complex building in Korea. Up-up method is utilized on Tower Palace III to shorten the term of works and it is that the curtain walls for the belt wall part are installed after the rests. The belt wall structure increases the horizontal structural stiffness of the building. The method of construction of super-block curtain wall is developed and used to raise and install the curtain wails of the belt wall floor. It is that the large block of curtain walls corresponding to three stories is fabricated on the ground in advance and the block is installed at a time by a tower crane. Specialized installing equipment :,s newly developed and applied to install the super-block. curtain wail. The curtain wall of the upper floor of the belt wall part is installed after the super-block. The installing equipment for this floor is developed utilizing a mini excavator and vacuum suctions. The application of this method had made it possible to omit the setting up the scaffold and financial profits such as the shortening of the terms of works was realized. The safety of works was secured and the productivity was also improved.

  • PDF