• Title/Summary/Keyword: temporary power cable installation

Search Result 2, Processing Time 0.017 seconds

Human Reliability Assessment for a Installation Task of Temporary Power Cables in Construction Fields (건설현장 임시전력 배선의 가설직무에 대한 인간신뢰성 평가)

  • Kim Doo-Hyun;Lee Jong-Ho;Kim Sang-Chul
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.2 s.70
    • /
    • pp.61-66
    • /
    • 2005
  • This paper presents an human reliability assessment(HRA) for a installation task of the temporary power cable in construction fields. HRA is evolved to ensure that the workers could reliably perform critical tasks such as a process of the temporary power cable. Human errors are extremely commonplace, with almost everyone committing at least some errors every day. The considerable parts of electric shock accidents in the construction field are caused by a series of human errors. Therefore it is required to analyze the human errors contained in the task causing electric shock event, the event tree analysis(ETA) is adopted in this paper, and particularly human reliability was estimated for a installation task of the temporary power cables. It was assumed that the error probabilities of the human actions may be obtained using the technique for human error rate prediction(THERP). The results show that the predominant task on reliability in the cable installation tasks is check-out tasks and the probability causing electric shock by human errors was calculated as $1.0\times10^{-9}$.

A Study of the Development of the Temporary Transformer System for the Replacement of Bum-out Pole Transformer (소손 주상변압기 교체를 위한 임시송전시스템 개발에 관한 연구)

  • Lee, Jung-Kyun;Yun, Young-Mo;Jeun, Si-Sik;Lee, Jae-Heon;Jeong, Dong-Ju;Park, Yong-Beom;Kim, Jeom-Sik;Jo, Seong-Mun
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.10a
    • /
    • pp.43-46
    • /
    • 2009
  • This paper describes a development of the temporary transformer system and method. The failure causes are genrally divided into problems in manufacturing, mounting and operating. To replace the bum-out pole transformers developed various facilities, power cable clamp, the control panel of self-sensing device and voltage connection box etc. That is more effective to establish the emergency transmission systems for the non interruption replacement of distribution transformers.

  • PDF