• Title/Summary/Keyword: track worker

Search Result 25, Processing Time 0.025 seconds

A Study on Fault Tree Construction for Track Worker's Risk Assessment (선로 작업자 위험도 예측을 위한 고장수목 구성 연구)

  • Kwak Sang-Log;Wang Jong-Bae;Park Chan-Woo;Cho Yuen-Ok
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.123-126
    • /
    • 2005
  • Recently many accidents have been occurred on track workers, these accidents have strong relationship with increase of train speed, electrification and multiple track portion. As a first step for the safety management, domestic and abroad track worker accidents data are analysed for the risk estimation of track worker. Analysis results shows that contact between track worker and train is the dormant reason. In order to reduce dormant reason fault trees are constructed in this study.

  • PDF

Safety Measures for the Track Work Safety (선로 작업자 안전향상을 위한 안전연구 현황)

  • Kwak Sang-Log;Hong Seon-Ho;Park Chan-Woo;Bhang Youn-Keun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.263-268
    • /
    • 2004
  • In many countries safety management on track worker have been carried out alter serious accidents and drastic safety improvement have been achieved as a result of safety management. In order to improve track worker safety in Korea, recent 5-year accident data were analysed and other countries' safety management systems were reviewed. As an result of this study 5-basic requirements for the safety improvement on track worker are derived: education, certification, clear responsibility definition, work planning and upgrade of train warning system.

  • PDF

Risk Assessment Case Study for the Track Worker Safety (철도유지보수 작업시 작업자 안전향상을 위한 위험도 분석 사례)

  • Kwak Sang-Log;Cho Yun-Ok;Wang Jong-Bae
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.247-253
    • /
    • 2004
  • For the preparation of KTX operation and electrifying the conventional line, many accidental fatalities were occurred in recent year. In order to improve track worker safety as low as possible, risk assessments are carried out in this study. As an input of risk assessment 5-year accident data were analyzed into frequency and fatality. As a result risk of track worker based on equivalent fatality is derived.

  • PDF

Risk Estimation Study on Railway Track Worker Hit by Train (철도 운행선로 작업자와 열차 접촉사고 위험도 평가에 관한 연구)

  • Kwak, Sang Log
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.72-78
    • /
    • 2020
  • The accident fatality rate has decreased by more than 90% compared to 2006, due to the safety management and safety investment based on the Rail Safety Act. Most railway safety indicators, including fatality rates, have improved significantly from 60% to 80%, reaching the level of developed countries in terms of most railway safety indicators. However, the only staff fatality rate at work is not improved, and it is 3 to 5 times higher than that of developed countries. Most of the fatality occurred during employee's work recently occurred due to accidents hit by train while track work. In principle, when operating track need to check or maintenance, the operation of the train should be stopped and the work carried out. However, in Korea, due to the highest passenger density and train operating density in the world, it is caused by a structural problem that requires workers to enter the track while the train is running and perform various tasks such as maintenance and inspection. In this study, we analyzed the risk of accidents caused by hit by trains on the track, which is the biggest cause of staff fatality, using the main statistics of the last 10 years. In detail, the scenarios of the main causes of hit by trains and workers were formed to suggest the effectiveness of the current preventive measures and supplementary.

Development of protection system to improve the safety of work on the track (선로내 작업 안전성을 높이기 위한 방호시스템 기술 개발)

  • Cho, B.K.;Choi, G.H.;Kang, S.G.
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.252-257
    • /
    • 2003
  • It is necessary to have a maintenance of track and its equipment for safety and s the railroad transportation. In the paper, we examine the safety problems, protecti and composition of protection system for safety within the track which RTRI develo system consists of a mobile business tool carried by each worker. a terminal of t platform temporarily installed in the maintenance car. a connector attached to signalling system and a central administrative device installed at the control cen used independently to detect positions of workers and maintenance cars. Each m correctly grasp the geometrical relations with other workers cars and other objects conditions based on the state information exchanged between the machines by the control protocol. the track occupancy monitor information broadcast by th administrative device and the line information. The protection system executes its f this basic structure.

  • PDF

Analysis of the Applicability of Aruco Marker-Based Worker Localization in Construction Sites (Aruco 마커 기반 건설 현장 작업자 위치 파악 적용성 분석)

  • Choi, Tae-Hung;Kim, Do-Keun;Jang, Se-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.205-206
    • /
    • 2023
  • This paper presents a new method for indoor localization track workers in construction sites. While GPS and NTRIP are effective for outdoor positioning, they are less accurate when used indoors. To address this issue, the proposed method utilizes Aruco markers to measure the distance between workers and the markers. By collecting data values, the location of each worker can be determined in real-time with high accuracy. This approach has the potential to enhance work efficiency and safety at construction sites, as it provides more precise indoor positioning compared to conventional methods, leading to improved work efficiency.

  • PDF

Simultaneous Tracking of Multiple Construction Workers Using Stereo-Vision (다수의 건설인력 위치 추적을 위한 스테레오 비전의 활용)

  • Lee, Yong-Ju;Park, Man-Woo
    • Journal of KIBIM
    • /
    • v.7 no.1
    • /
    • pp.45-53
    • /
    • 2017
  • Continuous research efforts have been made on acquiring location data on construction sites. As a result, GPS and RFID are increasingly employed on the site to track the location of equipment and materials. However, these systems are based on radio frequency technologies which require attaching tags on every target entity. Implementing the systems incurs time and costs for attaching/detaching/managing the tags or sensors. For this reason, efforts are currently being made to track construction entities using only cameras. Vision-based 3D tracking has been presented in a previous research work in which the location of construction manpower, vehicle, and materials were successfully tracked. However, the proposed system is still in its infancy and yet to be implemented on practical applications for two reasons. First, it does not involve entity matching across two views, and thus cannot be used for tracking multiple entities, simultaneously. Second, the use of a checker board in the camera calibration process entails a focus-related problem when the baseline is long and the target entities are located far from the cameras. This paper proposes a vision-based method to track multiple workers simultaneously. An entity matching procedure is added to acquire the matching pairs of the same entities across two views which is necessary for tracking multiple entities. Also, the proposed method simplified the calibration process by avoiding the use of a checkerboard, making it more adequate to the realistic deployment on construction sites.

A Study on the Improvement for a Defect Diagnosis of Track Circuit on HSL (고속선 궤도회로 결함진단을 위한 개선방안 연구)

  • Park, Ki-Bum;Lee, Tae-Hoon;Lee, Gi-Chun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1656-1664
    • /
    • 2007
  • This paper introduces a study of improvement for a defect diagnosis of the UM71C track circuit using on HSL. The track circuit on HSL has long operation section. Therefore, when the worker maintain, many times and efforts are spent. So, periodically, we have operated a inspection car. However, we don't know exactly the state changed of the inspection data when track circuit has defect. Actually, We fixed a sample area within operation section on HSL and performed the simulations for short circuit current that is reflected characteristic impedance and propagation factor. We compared the measuring data with the result of the simulation. Using verified simulation program, we estimated inspection data as the malfunction number and the change of capacity of compensation capacitor. These study need to secure of the safety as the train operation. Also, It needs to make a criteria of analysis for the maintenance through comparison simulation data and inspection data.

  • PDF

Entity Matching for Vision-Based Tracking of Construction Workers Using Epipolar Geometry (영상 내 건설인력 위치 추적을 위한 등극선 기하학 기반의 개체 매칭 기법)

  • Lee, Yong-Joo;Kim, Do-Wan;Park, Man-Woo
    • Journal of KIBIM
    • /
    • v.5 no.2
    • /
    • pp.46-54
    • /
    • 2015
  • Vision-based tracking has been proposed as a means to efficiently track a large number of construction resources operating in a congested site. In order to obtain 3D coordinates of an object, it is necessary to employ stereo-vision theories. Detecting and tracking of multiple objects require an entity matching process that finds corresponding pairs of detected entities across the two camera views. This paper proposes an efficient way of entity matching for tracking of construction workers. The proposed method basically uses epipolar geometry which represents the relationship between the two fixed cameras. Each pixel coordinate in a camera view is projected onto the other camera view as an epipolar line. The proposed method finds the matching pair of a worker entity by comparing the proximity of the all detected entities in the other view to the epipolar line. Experimental results demonstrate its suitability for automated entity matching for 3D vision-based tracking of construction workers.

Development of an Imaging Based Gang Protection System

  • Grimm, M.;Pelz, M.
    • International Journal of Railway
    • /
    • v.1 no.4
    • /
    • pp.149-156
    • /
    • 2008
  • During maintenance or construction works in or at the tracks of railways, high risks for passengers and railway staff, especially for the workers on the construction site exist. The high risks result out of the movement of rail vehicles, like trains or construction vehicles, which must be faced by using any available technical and operational technologies for securing them against the environment. Therefore, it is necessary to evaluate the level of protection continuously and to identify new and innovative methods and technologies for the protection of the gang (construction worker, machines and material). Especially on construction sites at line sections with two or more parallel tracks but also with single tracks, there are still a lot of incidents and accidents mostly with seriously injured persons or fatalities. These were mainly gang members that breach the railway-loading gage. By using proper warning or protection systems, the avoidance of such accidents must be achieved. The latest developments. in gang protection systems concern on the one hand fixed barriers in the middle between the construction site and the operated track and on the other hand construction vehicles equipped with automatic warning systems. The disadvantage of such protection methods is that the gang can be warned against an approaching train but a monitoring of the gang members cannot be performed. Only one part of a potential dangerous situation will be detected. If the gang members will overhear the acoustic warning signal of the security staff and the workers will not leave the danger zone in the track, the driver of the approaching train had no chance to react to the dangerous situation. An accident is often inevitable. While the detection of acoustic warning signals by the gang members working on a construction site is very difficult, the acoustical planning of an automatic warning system has to be designed for an acoustic short range level of one meter besides the construction vehicle. The decision about the use of today's technical warning system (fixed systems, automatic warning systems, etc.) must be geared to the technical feasibility and the level of safety which is needed. Criteria for decision guidance to block a track should be developed by danger estimation and economical variables. To realize the actual jurisdiction and to minimize the hazards of railway operations by the use of construction vehicles near the tracks further developments are needed. This means, that the warning systems have to be enhanced to systems for protection, which monitor the realization of the warning signal as a precondition for giving a movement authority to a train. This method can protect against accidents caused by predictable wrongdoing. The actual state of the art technique of using a collective warning combined with additional security staff is no longer acceptable. Therefore, the Institute of Transportation System of the German Aerospace Center in Braunschweig (Germany) will develop a gang warning and protection system based upon imaging methods, with optical sensors such as video in visible and invisible ranges, radar, laser, and other. The advantage of such a system based on the possibility to monitor both the gang itself and the railway-loading gauge either of the parallel track or of the same track still in use. By monitoring both situations, the system will be able to generate a warning message for the approaching train, that there are obstacles in the track, so that the train can be stopped to prevent an accident. And also the gang workers will be warned, while they breach their area.

  • PDF