• Title/Summary/Keyword: unit price

Search Result 599, Processing Time 0.033 seconds

Analysis of the Influence of Changing the Announcement Date of Standard for Construction Cost Estimation (표준시장단가 공고시기 조정에 따른 영향분석 연구)

  • Lee, Ju-hyun;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.204-205
    • /
    • 2020
  • Construction Standard Unit Price is the unit price calculated based on the market price for work items in construction projects that have already been conducted. It is used as basic data for calculating the budget price of public construction projects. In the Construction Standard Unit Price Book implemented in the second half of 2020, there are 1,810 types of unit prices. Since 2017, 100-150 construction standard unit prices have been revised semiannually (on January 1 and July 1 of each year) through Construction Site Surveys. Other work items have been set based on the rate of inflation during the corresponding period. Later in 2020, this procedure was changed, with on-site survey period extended to one year to strengthen the construction standard unit price investigation. The revisions previous announced during the second half of the year were changed only to reflect the price inflation rates. With such changes in the revisions to construction standard unit prices, one important issue that was raised: The timing of announcing the revisions during the second half of the year (reflecting the price inflation rates). The market unit wage, which is the unit price standard of labor cost that takes up a large part of the construction cost, is announced in January and September. The figures announced in September is reflected on the construction standard unit price four months later in January, but the market unit wage announced in January is reflected only six months after in July, which causes a timing issue. As such, the current study analyzed problems rising from the changed timing of the announcements of the construction standard unit price during the second half of the year, in addition to analyzing their impact on public construction projects.

  • PDF

Ripple Effect Analysis of Construction Standard Unit Price in Public Construction (공공건설공사 표준시장단가 적용 파급효과 분석)

  • Jin, Zheng-Xun;Baek, Seung-Ho;Lee, Ju-Hyun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_3
    • /
    • pp.1207-1219
    • /
    • 2022
  • 「Act On Contracts To Which The State Is A Party」 stipulates that the "Construction Standard Production Rate" and "Construction Standard Unit Price" be used as the criteria for determining the estimated price of construction works performed by public institutions. In this regard, issues such as the application scope of the Construction Standard Unit Price, and the effect of budget reduction continue. However, due to the lack of quantitative data on the actual application of Construction Standard Unit Price, it is difficult to objectively evaluate various issues. In order to prepare data for objective evaluation of the Construction Standard Unit Price, this study analyzed the ripple effect of applying the Construction Standard Unit Price based on the bill of quantity. As a result of the analysis, the Construction Standard Unit Price ripple effect in the civil engineering part was 9.2%, and it was analyzed that there was a ripple effect of about 1.9% based on the civil engineering direct cost. In the construction part, the ripple effect was analyzed to be relatively high at 17%, but it was found to have a ripple effect of about 3% in the construction direct cost. Based on the total direct cost, the ripple effect was calculated as 2.2%. Based on the analysis results, it is possible to evaluate the effect of applying the Standard Market Unit Price, and it is expected to be used as basic data to solve issues. As a future study, it is necessary to additionally analyze the ripple effect by Standard Market Unit Price application range (over 10 billion, over 20 billion won, etc.) and delivery system type (comprehensive evaluation, qualification examination, technical bidding, etc.). In addition, it is necessary to study the appropriate ripple effect of the Standard Market Unit Price.

Evaluation of Menu Management and Nutrition Supply in Industrial Foodservice by Food Cost (식품원가 분류에 따른 산업체급식의 식단관리 및 영양공급량평가)

  • Park, Myung-Hee;Choi, Bong-Soon
    • Journal of the Korean Society of Food Culture
    • /
    • v.8 no.2
    • /
    • pp.91-101
    • /
    • 1993
  • Unit price of meal provision in industrial foodservice differs with each business. It is believed that menu management work, contents of menu, and nutrition supply performed by dietitian are different with unit price of meal provision. In this sense, purposes of this study are to examine meal management work and contents of menu, by food cost, at industrial foodservice in Taegu, Kyungbuk area and to evaluate variety of menu and nutrition supply. Results of the study are as follows: 1. Average number of side dishes provided at meal, including Kimchi, was 2 at low unit price, 3.0 at middle unit price and 3.1 at high unit price. 2. Possession ratio of account books using for menu management was low. 3. With regard to kind of menu, high unit price was most various and showed more various, compared to low unit price, especially in cooking oil-used cook methods such as broil, pan-fried food, fry, and roast. 4. High unit price was found as the highest in kind of used food and supply volume. 5. Sugar, Mineral, Vitamine, and Protein were satisfied with standard food content, but fat and calcium were not. 6. Supply volume of food was positively correlated to supply volume of nutrient, but kinds of cook methods and food type were not correlated to that of nutrient.

  • PDF

Effect of Attentiveness in Purchase behavior and Consumer Knowledge on use of unit Price Information

  • Kim Heaseon;Kim Bo-Geum
    • International Journal of Human Ecology
    • /
    • v.5 no.2
    • /
    • pp.81-91
    • /
    • 2004
  • The purpose of this study is to evaluate consumer use of unit price information introduced in Korea 1999. A total of 571 observations were analyzed by frequency, percent, and paired t-test using SPSS. The main findings are (1) consumers use unit price information to make better purchase decisions, (2) consumers with higher than average attentiveness in purchase behavior utilize unit price information to make better buying decisions, and (3) consumers with higher than average knowledge utilize unit price information to make better buying decisions. (4) Also if either attentiveness in purchase behavior or consumer knowledge is lower than average, unit price information helped consumers make better purchase decisions. (5) However, there was no difference among those consumers with below average or above average attentiveness and knowledge.

Contribution analysis of Hanwoo carcass traits on unit price in national slaughter house

  • Eum, Seung-Hoon;Park, Hu-Rak;Seo, Jakyeom;Cho, Seong-Keun;Kim, Byeong-Woo
    • Korean Journal of Agricultural Science
    • /
    • v.43 no.4
    • /
    • pp.603-611
    • /
    • 2016
  • The aim of this study was to analyze the contribution factors (backfat thickness, eye muscle area, carcass weight, marbling score, and feeding period) affecting meat unit price (South-Korean Won / Kg of meat). The best slaughtering age to maximize unit price was also assumed. All data used in this study were acquired from the Korea Institute for Animal Products Quality Evaluation from 2010 to 2014. Contributions to the estimated unit price of cows by the following factors, backfat thickness, eye muscle area, carcass weights, feeding period, and marbling score were 2.65%, 0.04%, 1.58%, 1.58%, and 95.72%, respectively. Contribution to estimated unit price of steers by the same factors (backfat thickness, eye muscle area, carcass weights, feeding period, and marbling score) were 7.88%, 1.24%, 0.07%, 90.81%, and 95.72%, respectively. Slaughtering ages ranged from 26 to 36 months and the data were separated into each month for an 11 month period. The unit price of meat from Hanwoo slaughtered at 30 months was highest among groups. The lowest unit price was observed in the group belonging to the Hanwoo slaughtered at 36 months. In conclusion, of all contributing factors, marbling score affected unit price the most. Based on our results, it is recommended that the optimal slaughtering age be set at 30 months to maximize unit price. Moreover, the feeding of beef cattle past 30 months of age is not recommended because of the increase in feeding costs.

Effects of Adoption of the Buy-price, Setting the Starting Bid Price, and Adoption of 'the Effective Fixed Price' on the Final Bid Prices in Internet Auctions (인터넷 경매에서 즉시구매옵션 설정여부, 시작가, 고정가형 판매방식여부가 낙찰가에 미치는 영향)

  • Lee, Yong-Seon;Ahn, Byong-Hun;Jang, Dae-Chul
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.32 no.1
    • /
    • pp.27-51
    • /
    • 2007
  • We analyze the effects of the sellers' strateiges on the final bid prices in internet auctions. We focus on the following three strategies of the seller adoption of the buy-price, setting the starting bid price, and adoption of 'the effective fixed price' which means that the starting bid price is set near the buy-price. In addition, the number of units sold single-unit or multi-unit, and item characteristics, such as whether the food is a search product (functional product) or an experience product (non-functional product), are also considered. We use real data on bids for 4 items from an online auction site. We find that in an auction for experience products when sold as single units, adopting the buy-price strategy raises the final bid price. We also find that in multi-unit auctions, starting the auction at 'the effective fixed price' raises the final bid price.

A Study of Transformation tendency of an Apartment Unit Plan after The Enforcement of Price Deregulation (분양가 자율화이후 공동주택 단위평면의 변화경향에 관한 연구)

  • Ko, Young-Seok;Kweon, Young;Kim, Yong-Sung
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2003.05a
    • /
    • pp.74-77
    • /
    • 2003
  • After the Enforcement of Price Deregulation of Apartment, Apartment house get down to originality goods, The Housing Market have reorganized the nucleus by a user, have demanding the development for discriminative unit plan. The purpose of this study is that before and after the Price Decontrol of Apartment take part a variety of unit plan, search for transformation factor and analyze into the tendency of the distinction plan of Housing Goods. Before and after the Price Decontrol of Apartment, Apartment unit have analyzed from 85 $m^2$ till 152 $m^2$ private area; ten corporations of civil construction' unit in Seoul and The national capital region supply apartment, will supply apartment. For selected examples, first, unit plan is normalized from the ratio of front to side wall, bay, a Room' organization and a kind of Room, number, and for examples of unit plan of apartment, the examples were analyzed with respect to change of a Room' organization and the number of a room and the ratio of front wall to side wall for item investigated. Finally, I search out course of transformation tendency of an apartment unit plan after Enforcement of Price Deregulation and analyzed a factor. The results of the study are follows, after Enforcement of Price Deregulation, unit plan of apartment lead to change lay out, to secure each family's privacy, to secure feeling for open hearted, tendency of flexibility.

  • PDF

A Study on the Risk Examination of the Unit Price of Public Housing Construction Projects (공공주택공사에서의 도급단가 리스크 규명에 관한 연구)

  • Kim, Soon-Young;Han, Choong-Hee;Baek, Tae-Ryong;Kim, Kyoon-Tai;Lee, Jun-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.35-44
    • /
    • 2010
  • Currently, the unit price of public construction projects are not being evaluated appropriately for several reasons. First, the evaluation of the unit price differ per nature of the bidding process and its estimation process. In fact, pricing is determined to meet the total price in turnkey projects and to pass the low bid price deliberation process in unit price projects, and thus, such prices cannot be said to be reasonable prices per public project. After the contract is awarded, however, the prices determined without taking into consideration the characteristic of each bidding process and price estimate process are used for the valuation of progress payment, design changes, and escalation. Furthermore, this is also being applied to other low bid deliberation process as actual public project unit price, thereby affecting other processes as well. In effect, this system increases the risks for both the owner and the bidder who have determined the unit price. This research examines the risk factor and its extent in order to properly manage it in preparation for the future.

Determinant Factors for the Apartment Unit Prices of Large Scale Apartment Complexes over 1,000 Households in Seoul Metropolitan Area (서울시 1,000세대 이상 대규모 아파트단지의 아파트가격 결정요인에 관한 연구)

  • Kim, Kwang-Young;Ahn, Jeong-Keun
    • Journal of the Korean housing association
    • /
    • v.21 no.6
    • /
    • pp.81-90
    • /
    • 2010
  • The existing most studies on the apartment sales prices have been limited to relatively small size apartment complexes and have not categorized the apartment complexes based on the number of households. Some of them uses the apartment-related indices such as regional value estimates, sales unit price, and view right values. In the case of Seoul Metropolitan Area, the size of apartment complex has been growing to the level of large complex over more than 1,000 households through new town development, redevelopment and reconstruction. People prefers to choose a large scale complex instead of small complex based on their perception that a large scale apartment complex provides more conveniences in living. The result of this analysis revealed that the variables chosen as important determinants of the hedonic price model for large scale apartment complexes were square meters of apartment unit, rent/price ratio, number of bays, distance to the nearest subway station, and heating system method. This means that the sales price of apartment unit will be higher as the square meters of apartment unit increase, as the rent/price ratio decreases, as the distance to the nearest subway station increases, and as the number of bays increase.

Competitiveness analysis of material and components industry by unit value indices (단가를 이용한 부품소재산업의 경쟁력 분석)

  • Lee, Oon-Kyu;Kang, Min-Sung
    • Proceedings of the KSME Conference
    • /
    • 2007.05a
    • /
    • pp.473-478
    • /
    • 2007
  • We analyze competitiveness of material and component industry(MCI) of Korea, China and Japan using trade data, OECD ITCS database with HS-code system. We use unit price indices, export unit price index, import unit price index, and TOT unit price index. These indices provide quality information from trade data of value and quantity. Our results show that there are quality gaps among three countries, and that China expand development potential, and the results vary as sectors. It implies that R&D investment to improve quality of MCI products is essential and that sector-specific policy is necessary.

  • PDF