대한전기학회:학술대회논문집 (Proceedings of the KIEE Conference)
- 대한전기학회 1993년도 정기총회 및 추계학술대회 논문집 학회본부
- /
- Pages.19-22
- /
- 1993
최대부하제어(最大負荷制御)의 경제적(經濟的) 타당성(妥當性) 검토(檢討)
Economic Feasibility Study for Peak Load Control
- Yu, Sung-Chul (Korea Electric Power Corporation) ;
- Yoon, Kap-Koo (ACE Engineering, Inc.) ;
- Cho, Soon-Bong (ACE Engineering, Inc.)
- 발행 : 1993.11.26
초록
Demand side management (DSM) is the planning and implementation of those utility designed to influence customer use of electricity in ways that will produce desired changes in the utility's load shape. It is conspicuous that the peak load control of DSM is efficiently adopted. In this paper, the package type air conditioner(A/C) mounted radio controlled switch. During the summer of 1990 KEPCO conducted tests in Seoul areas to determine the economic feasibility of interrupting A/C units for short periods of time during peak load periods. These tests were performed between July 30 and September 20 and were limited to the hours of between 1 and 6 p.m. These tests indicated that each A/C contributes approximately 4.5kW to the system peak and can be switched off 10 minutes out of each 1/2 hour without causing the customer any discomfort. Switching each A/C off for 10 minutes out of each 1/2 hour results in a peak load demand reduction of one kW per unit.
키워드