Power Generation Unit Modelling in Thermal Power Plant

서천화력 발전기 및 제어시스템 모델링

  • Published : 2003.07.21

Abstract

This paper provides the procedure to derive model parameters from the field tests. Since the accuracy of power system analysis depends on the accuracy of models used to represent the generation units, the reliability of power system analysis could be affected by parameters used in those models. The objective of this paper is to validate and update the models. So the field test had performed for thermal units and adjusting the variables to match with the measured values derived their model parameters. And the model parameters are verified by comparing the variables between models.

Keywords