철도교 상시계측시스템의 센서교정방안 연구

A Study on Calibrations of health monitoring system installed in Railway bridge

  • 발행 : 2003.10.01

초록

Calibration and gauge factor readjustment process made for the health monitoring system installed in the railway bridges is reviewed and some findings are explained in this study: specifically, the calibrators made for this purpose are illustrated and the regression processes of the calibration on long-term displacement using water level sensor, longitudinal displacement using LVDT sensor, instantaneous displacement using LVDT sensors and accelerometer are described in details. Based on the regression results, new gauge factors are obtained from regression equation and another verification is made by performing another calibration again with new factors. From the second calibration, it was found that the suggested regression curves and their factors are appropriate and much better results are expected. Future work will be concentrated on the long-term analysis of the measurement data and on the database structures so that the assessment of the structure such as damage detection and remaining life estimation is possible.

키워드