The Construction Work Completion of the Fuel Test Loop

핵연료 노내조사시험설비 설치공사 완료

  • 박국남 (한국원자력연구원, 하나로이용연구본부) ;
  • 이정영 (한국원자력연구원, 하나로이용연구본부) ;
  • 지대영 (한국원자력연구원, 하나로이용연구본부) ;
  • 박수기 (한국원자력연구원, 하나로이용연구본부) ;
  • 심봉식 (한국원자력연구원, 하나로이용연구본부) ;
  • 안성호 (한국원자력연구원, 하나로이용연구본부) ;
  • 김학노 (한국원자력연구원, 하나로이용연구본부) ;
  • 이종민 (GNEC 기술사사무소)
  • Published : 2007.05.30

Abstract

FTL(Fuel Test Loop) is a facility that confirms performance of nuclear fuel at a similar irradiation condition with that of nuclear power plant. FTL consists of In-Pile Test Section (IPS) and Out-Pile System (OPS). FTL construction work began on August, 2006 and ended on March, 2007. During Construction, ensuring the worker's safety was the top priority and installation of the FTL without hampering the integrity of the HANARO was the next one. Task Force Team was organized to do a construction systematically and the communication between members of the task force team was done through the CoP(community of Practice) notice board provided by the Institute. The installation works were done successfully overcoming the difficulties such as on the limited space, on the radiation hazard inside the reactor pool, and finally on the shortening of the shut down period of the HANARO. Without a sweet of the workers of the participating company of HEC(Hyundae Engineering Co, Ltd), HDEC(HyunDai Engineering & Construction Co. Ltd), equipment manufacturer, and the task force team, it is not possible to install the FTL facility within the planned shutdown period. The Commissioning of the FTL is on due to check the function and the performance of the equipment and the overall system as well. The FTL shall start operation with high burn up test fuels in early 2008 if the commissioning and licensing progress on schedule.

Keywords