타설지연시간 변화에 따른 초지연제 사용 콘크리트의 부착강도

The Bond Strength of Super Retarding Concrete According to Delay Time of Placement

  • 한수환 (청주대학교 건축공학과) ;
  • 신세준 (청주대학교 건축공학과) ;
  • 최윤호 (청주대학교 건축공학과) ;
  • 김종 (청주대학교 건축공학과) ;
  • 한민철 (청주대학교 건축공학과) ;
  • 한천구 (청주대학교 건축공학과)
  • 발행 : 2020.11.12

초록

In this study, in order to check whether the adhesion strength can be secured when installing concrete by mixing super-retarding agents, the splitting tensile strength of the joints of each mold was measured and then analyzed. The results of the experiment showed that the bonding performance of the joint is adversely affected if the installation delay is delayed for more than 24 hours, and that the attachment performance can be secured if the installation is delayed within about 24 hours.

키워드