Big Y development for line Yield Improvement in a Factor

Big Y 전개를 통한 장치 Line의 Yield 향상

  • 문기주 (동아대학교 산업시스템공과) ;
  • 박우종 (동아대학교 산업시스템공과)
  • Published : 2004.12.01

Abstract

Current companies 집중 on how to operate and select projects to achieve the best result. 6sigma projects are chosen in the best suitable concept, which are solved by the 6Sigma experts according to the priority. And every project has to be launched not the view of individual management factors but the total factors, Big Y. Therefore, a process needs to be treated to connect the vital few factors in various processes to improve the yield, which is the main performance criteria in a manufacturing industry This report is to make the total optimization through the Vital-Few mapping between quality characteristics and process factors in a manufacturing line. Accordingly, it means to secure lower variance by making the CTP(Critical To Process) optimization and finally to improve the yield.

Keywords

References

  1. Harry, Mikel J., Tri Star-Boze Pubns(1997), 'Vision of Six Sigma'
  2. Six Sigma Qualtec(2000), 'Six Sigma Black Belt Training'
  3. The Juran Institute, McGraw Hill(2001) 'The Six Sigma Basic Training Kit'
  4. 책 웰치(2001), 청림출판, '잭웰치, 끝없는 도전과 용기'
  5. 마이클해리.리처드슈뢰더(1999), 김영사, '6 Sigma 기업혁명'
  6. LG Learning Center(2002), 'Sigma Black Belt 과정 Manual'
  7. 박성현,박영현,이명주(1997), 민영사, '통계적 공정관리'
  8. 아오키야스히코, 미타마시히로, 안도유리키(1988), 21세기북스, '6시그마경영'
  9. 아오키야스히코, 미타마시히로, 안도유리키(1999), 21세기북스, '6시그마 도입전략'
  10. 고두균, 김상익, 서한손, 안병진(2000), 한국 생산성본부, '6시그마경영 이해와 적용'
  11. 로버트 슬레이터, 강석진, 이태복 옮김(2001), '잭웰치와 GE 방식'
  12. 한국 능률협회 컨설팅(2001), '6시그마 품질달성을 위한 시스템 구축과정 교육 Manual'
  13. 피터 팬드, 신완선 옮김(2001), 물푸레 '6시그마로 가는 길'