Abstract
Current design-build contract is the type of joint venture, but performs by separate party which causes change orders due to the lack of communication between design and construction, so it cannot lead the main object which is the integration of design and construction. Furthermore, the current design-build contract is impossible to reduce the project costs by VE at the design development phase because the design proceeds with the fixed price through bidding. Like these limitless, the analysis results of the case of VE in the design-build projects, several problems that are prevented from active design VE are elicited by the project participants. Meanwhile, Ministry of Construction & Transportation decided to enlarge the VE review system lately. Therefore, in this study, it presented model of design VE partnering of design-build and partnering agreements form to apply design VE and to try to be able to lead the design VE to be more successful in public design-build projects.
현행 일괄입찰방식은 분담이행방식의 공동도급형태로 운영되고 있어, 참여업체간의 의사소통 부족으로 설계기술과 시공기술의 접목이라는 일괄입찰방식 본래의 취지를 살리지 못하고 있다. 또한 입찰을 통해 확정된 총액금액으로 설계가 진행되므로 실시설계단계에서 VE활동을 통한 원가절감 노력이 거의 이루어지지 않고 있는 실정이다. 이에 본 연구에서는 현행 설계시공일괄방식의 특성을 파악하고 설계VE 적용사례를 분석하여, 설계VE 적용의 문제점이 무엇인지를 파악한 후, 일괄입찰사업 수행절차에서 설계VE 적용의 효과를 극대화할 수 있는 파트너링의 활용방법 및 그 적용시기를 제안한다.