Safety Evaluation of Elevated Guideway during Abnormal Operation on LRT of Driverless Automatic Driving System

무인자동운전 경전철시스템 고가교량의 비상운전 중 안전성평가

  • Published : 2006.02.01

Abstract

Trains in LRT(Light Railway Transit) system usually have shorter car length than metro's because of their smaller passensers demand. Therefore it is very likely that the load condition of LRT system in abnormal operation, in case of which trains are in close proximity by system broke or train rescue works, could be worse rather than in normal operation, in spite of rare probability of abnormal operation. In this study, the target reliability indexes of several abnormal operations are estimated in accordance with the occurrence probabilities of each abnormal operation case and the reliability index of normal operation presented by the specification. From the indexes, load factors for the abnormal operation cases are estimated and the safety evaluation is performed for Yong-in LRT project.

Keywords

References

  1. ACI 358 Committee, 'Analysis and Design of Reinforced and Prestressed Concrete Guideway Structures', ACI, 1999
  2. Louis, F. G., Robert, O. D., Reidar, B., 'Load and Resistance Factor Design of Steel Structures', Prentice Hall, New Jersey, 1994, pp.24-57
  3. Lind, N. C., 'Consistent partial safety factors', Journal of the Structural Division, ASCE, Vol.97, No.ST6, June 1971 pp.1651-1669