건설기계 유압밸브 생산을 위한 일정계획 시스템 개발

Development of Scheduling System for Production of the Hydraulic Control Valve of Construction Equipment

  • 김기동 (강원대학교 산업공학과) ;
  • 이보헌 (강원대학교 대학원 산업공학과)
  • 발행 : 2007.02.28

초록

The construction machine is the composite machine assembled by about 30,000 parts. Excavator, one kind of a construction machine, plays the leading role for export of construction equipment. It is generally impossible to produce all of the items within one company. Especially the supply of hydraulic control valves, one of the core part of the construction equipment, depends on the import heavily. So it is important to make an efficient production plan of hydraulic control valves in the company. The most important thing for the production scheduling of a hydraulic control valve is to make production schedule keeping the start date for assembly line for an excavator and to make minimization of the stock level. The production plan of hydraulic control valve includes the decision of the quantity supplied by subcontractor. This paper presents a scheme for a scheduling system of the hydraulic control valve considering the schedule of the assembly line for excavator production. This paper provides a methodology, which can make a plan of supply and production and generate a detailed schedule for daily production.

키워드