DOI QR코드

DOI QR Code

A Study on Impact Testing of a Rolling-stock Windscreen

철도차량 전면창유리 충격시험에 관한 연구

  • Received : 2013.07.09
  • Accepted : 2013.09.11
  • Published : 2013.10.31

Abstract

This study describes impact test methods for a rolling-stock windscreen executed in Korea and Europe. Air-pressurized impact test equipment for the front windscreens of high speed trains was designed and manufactured. The equipment is capable of launching a projectile at 500km/h, in accordance with EN 15152's impact test method. Calibration of the test equipment was conducted to find an equation relating air pressure and projectile velocity. Specimens ($1000mm{\times}700mm$) having similar specifications with the front windscreens in metro and conventional trains were used to conduct impact tests with this equipment to research the impact characteristics of the screens according to the impact velocity.

철도차량 전면창유리 충격 시험 및 특성 파악을 위해 유럽 및 국내의 전면창유리 충격 시험 방법을 비교 검토하였다. EN 15152에 따른 고속철도차량의 전면창유리 충격 시험이 가능한 정도인 약 500km/h 속도로 충돌체를 발사할 수 있는 압축 공기식 충격 실험 발사 장치를 설계 및 제작하였으며, 이 발사장치의 충돌체 발사 성능 확인을 위해 속도 보정 실험을 실시하여 압축 공기에 따른 충돌체의 발사 속도 관계식을 도출하였다. 도시철도 및 일반철도에 사용되는 동일한 사양의 전면창유리 시편($1000mm{\times}700mm$)에 제작한 발사 장치를 이용해 충돌 시험을 수행하여 충돌 속도에 따른 시편의 충격 특성을 살펴보았다.

Keywords

References

  1. F.W. Flocker, L.R. Dharani (1997) Modelling fracture in laminated architectural glass subject to low velocity impact, Journal of Materials Science, 32, pp. 2587-2594. https://doi.org/10.1023/A:1018698900942
  2. Commission of the European communities (2008) Commission decision of 21 February 2008 concerning a technical specification for interoperability relating to the 'rolling stock' subsystem of the trans-European high-speed rail system, 2008/232/CE.
  3. The European Commission (2011) Commission decision of 26 April 2011 concerning a technical specification for interoperability relating to the rolling stock subsystem - 'Locomotives and passenger rolling stock' of the trans-European conventional rail system, 2011/291/EU.
  4. European Standard (2007) Railway applications - front windscreens for train cabs, EN 15152:2007.
  5. Ministry of Land, Infrastructure and Transport (2010) Guidelines for railway safety standards (Notice of MLIT 2010-637) [Appendix 18] Detail pane safety standards for railway vehicles
  6. S.M. Wiederhorn, B.J. Hockey (1983) Effect of material parameters on the erosion resistance of brittle material, Journal of Materials Science, 18, pp. 766-780. https://doi.org/10.1007/BF00745575
  7. M.M. Chaudhri, C.R. Kurkjian (1986) Impact of small steel spheres on the surfaces of "Normal" and "Anomalous" glasses, Journal of the American Ceramic Society, 69(5), pp. 404-410. https://doi.org/10.1111/j.1151-2916.1986.tb04769.x
  8. R.F. Cook, G.M. Pharr (1990) Direct observation and analysis of indentation cracking in glasses and ceramics, Journal of the American Ceramic Society, 73(4), pp. 787-817. https://doi.org/10.1111/j.1151-2916.1990.tb05119.x
  9. K.H. Im, J.H. Kim, I.Y. Yang (1997) A study on penetration fracture characteristics of glass plates subjected to impact loadings, KSME International Journal, 11(6), pp. 639-649. https://doi.org/10.1007/BF02946334
  10. R. Hosseinzadeh, M.M. Shokrieh, L. Lessard (2006) Damage behabior of fiber reinforced composite plates subjected to drop weight impacts, Composites Science and Technology, 66, pp. 61-68. https://doi.org/10.1016/j.compscitech.2005.05.025
  11. J.Y. Chang, N.S. Choi (2009) Surface fracture behaviors of unidirectional and cross ply glass fiber/epoxy lamina-coated plates under a small-diameter steel ball impact, Journal of the Korean Society for Composite Materials, 22(4), pp. 33-40.
  12. H.B. Kwon, D.S. Chang (2010) A study on the window glass pressure for high-speed train, Journal of the Korean Society for railway, 13(4), pp. 371-375.
  13. D.S. Chang, W. Yi (2011) A study on the pressure test of the glass window for high speed train, Journal of the Korean Society for railway, 14(5), pp. 391-397. https://doi.org/10.7782/JKSR.2011.14.5.391
  14. C.S. Jeon, Y.G. Kim, S.H. Yun, H.B. Kwon, et al. (2012) A study on impact damage characteristics of the window glass for high speed train, Journal of the Korean Society for railway, 15(3), pp. 217-223. https://doi.org/10.7782/JKSR.2012.15.3.217
  15. International Union of Railways (2002) Layout of driver's cab in locomotives, railcars, multiple unit trains and driving trailers, UIC CODE 651.
  16. Railway Safety (2002) Structural requirements for windscreens and windows on railway vehicles, Railway Group Standard, GM/RT 2456.
  17. Railway Safety (2012) Requirements for rail vehicle structures, Railway Group Standard, GM/RT 2100.