References
- Avikal, S., Jain, R., and Mishra, P. K. (2014), A Kano model, AHP and M-TOPSIS method-based technique for disassembly line balancing under fuzzy environment, Applied Soft Computing, 25, 519-529. https://doi.org/10.1016/j.asoc.2014.08.002
- Bentaha, M. L., Battaia, O., and Dolgui, A. (2014), A sample average approximation method for disassembly line balancing problem under uncertainty, Computers and Operations Research, 51, 111-122. https://doi.org/10.1016/j.cor.2014.05.006
- Bentaha, M. L., Battaïa, O., and Dolgui, A. (2014), Lagrangian relaxation for stochastic disassembly line balancing problem, Procedia CIRP, 17, 56-60. https://doi.org/10.1016/j.procir.2014.02.049
- Gen, M., Tsujimura, Y., and Li, Y. (1996), Fuzzy assembly line balancing using genetic algorithms, Computers and Industrial Engineering, 31(3), 631-634. https://doi.org/10.1016/S0360-8352(96)00277-X
- Go, T. F., Wahab, D. A., Rahman, M. A., Ramli, R., and Hussain, A. (2012), Genetically optimised disassembly sequence for automotive component reuse, Expert Systems with Applications, 39(5), 5409-5417. https://doi.org/10.1016/j.eswa.2011.11.044
- Gungor, A. and Gupta, S. M. (1999), Disassembly line balancing, In Proceedings of the 1999 annual meeting of the northeast decision sciences institute, 24-26.
- Gungor, A. and Gupta, S. M. (2002), Disassembly line in product recovery, International Journal of Production Research, 40(11), 2569-2589. https://doi.org/10.1080/00207540210135622
- Kalayci, C. B. and Gupta, S. M. (2011), Tabu search for disassembly line balancing with multiple objectives, In 41st International conference on computers and industrial engineering (CIE41), 477-482.
- Kalayci, C. B. and Gupta, S. M. (2013), Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem, Expert Systems with Applications, 40(18), 7231-7241. https://doi.org/10.1016/j.eswa.2013.06.067
- Kalayci, C. B., Hancilar, A., Gungor, A., and Gupta, S. M. (2015), Multi-objective fuzzy disassembly line balancing using a hybrid discrete artificial bee colony algorithm, Journal of Manufacturing Systems, 37, 672-682. https://doi.org/10.1016/j.jmsy.2014.11.015
- Lee, E. S. and Li, R. J. (1988), Comparison of fuzzy numbers based on the probability measure of fuzzy events, Computers and Mathematics with Applications, 15(10), 887-896. https://doi.org/10.1016/0898-1221(88)90124-1
- McGovern, S. M. and Gupta, S. M. (2007), A balancing method and genetic algorithm for disassembly line balancing, European Journal of Operational Research, 179(3), 692-708. https://doi.org/10.1016/j.ejor.2005.03.055
- Ozceylan, E., Paksoy, T., and Bektas, T. (2014), Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing, Transportation research part E: logistics and transportation review, 61, 142-164. https://doi.org/10.1016/j.tre.2013.11.001
- Paksoy, T., Gungor, A., Ozceylan, E., and Hancilar, A. (2013), Mixed model disassembly line balancing problem with fuzzy goals, International Journal of Production Research, 51(20), 6082-6096. https://doi.org/10.1080/00207543.2013.795251
- Tapkan, P., Ozbakir, L., and Baykasoglu, A. (2012), Bees algorithm for constrained fuzzy multi-objective two-sided assembly line balancing problem, Optimization Letters, 6(6), 1039-1049. https://doi.org/10.1007/s11590-011-0344-9
- Tovey, C. A. (2002), Tutorial on computational complexity. Interfaces, 32(3), 30-61. https://doi.org/10.1287/inte.32.3.30.39
- Tsujimura, Y., Gen, M., and Kubota, E. (1995), Solving fuzzy assembly-line balancing problem with genetic algorithms, Computers and Industrial Engineering, 29(1), 543-547. https://doi.org/10.1016/0360-8352(95)00131-J
- Van Hop, N. (2006), A heuristic solution for fuzzy mixed-model line balancing problem, European Journal of Operational Research, 168(3), 798-810. https://doi.org/10.1016/j.ejor.2004.07.029
Cited by
- Minimum Quantity Lubrication and Carbon Footprint: A Step towards Sustainability vol.9, pp.5, 2017, https://doi.org/10.3390/su9050714
- EOQ inventory models for disassembly systems with disposal and lost sales pp.1366-588X, 2018, https://doi.org/10.1080/00207543.2018.1542180
- Disassembly line balancing problem: a review of the state of the art and future directions pp.1366-588X, 2018, https://doi.org/10.1080/00207543.2018.1428775
- A Pareto firefly algorithm for multi-objective disassembly line balancing problems with hazard evaluation pp.1366-588X, 2018, https://doi.org/10.1080/00207543.2018.1471238
- A Novel Multi-Efficiency Optimization Method for Disassembly Line Balancing Problem vol.11, pp.24, 2019, https://doi.org/10.3390/su11246969
- Multi-objective evolutionary simulated annealing optimisation for mixed-model multi-robotic disassembly line balancing with interval processing time vol.58, pp.3, 2016, https://doi.org/10.1080/00207543.2019.1602290
- A multi-objective distribution-free model and method for stochastic disassembly line balancing problem vol.58, pp.18, 2020, https://doi.org/10.1080/00207543.2019.1656841
- Optimization of Remanufacturing Disassembly Line Balance Considering Multiple Failures and Material Hazards vol.12, pp.18, 2016, https://doi.org/10.3390/su12187318
- Energy-Efficient Optimization of Two-Sided Disassembly Line Balance Considering Parallel Operation and Uncertain Using Multiobjective Flatworm Algorithm vol.13, pp.6, 2016, https://doi.org/10.3390/su13063358