재작업과 폐기가 수반되는 경제적 생산량 모형

Economic Manufacturing Quantity Models with Rework and Disposal

  • 손권익 (강원대학교 시스템경영공학과)
  • 발행 : 2016.02.29

초록

This paper presents EMQ models in which some proportion of defective items are produced and some of them are converted to good items through rework process and items not converted are disposed. Numerical models are developed for three cases of disposal and optimal solution of each model is derived. In the first model, if a defective item is found during the production process, only re-workable items are stored and reworked after normal production is finished. Not re-workable items are disposed immediately during normal production. The second model deals with the case where all defective items are stored and items to be disposed are determined in rework process. In the third model, an additional inspection process exists before rework to determine rework or disposal. Numerical examples are presented to validate the proposed models.

키워드

참고문헌

  1. A. M. M. Jamal, B. R. Sarker, S. Mondal, "Optimal Manufacturing Batch Size with Rework Process at a Single-Stage Production System", Computer & Industrial Engineering, Vol.47, No.1, pp.77-89, 2004. https://doi.org/10.1016/j.cie.2004.03.001
  2. H. L. Lee and M. J. Rosenblatt, "Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System", Management Science, Vol.33, No.9, pp.1125-1136, 1987. https://doi.org/10.1287/mnsc.33.9.1125
  3. H. L. Lee and M. J. Rosenblatt, "A Production and Maintenance Planning Model with Restoration Costs Dependent on Detection Delay", IIE Transactions, Vol.21, No.4, pp.368-375, 1989. https://doi.org/10.1080/07408178908966243
  4. M. J. Rosenblatt and H. L. Lee, "Economic Production Cycles with Imperfect Production Processes", IIE Transactions, Vol.18, No.1, pp.48-55, 1986. https://doi.org/10.1080/07408178608975329
  5. 김창현, "재작업이 수반되는 경우에서의 경제적 생산량 결정", 대한산업공학회지, 제31권, 제2호, pp.173-179, 2005.
  6. 김창현, "생산시스템이 불완전하여 재작업이 요구되는 상황에서의 최적 생산시간 결정에 관한 연구", 대한산업공학회지, 제40권, 제2호, pp.233-239, 2014. https://doi.org/10.7232/JKIIE.2014.40.2.233
  7. 김창현, 홍유신, "퇴화하는 기계에서의 품질 불량을 고려한 최적 생산시간 결정", 대한산업공학회지, 제22권, 제3호, pp.351-364, 1996.
  8. 김창현, 홍유신, "품질 불량을 고려한 최적 검사 계획 및 생산시간 결정", 대한산업공학회지, 제23권, 제2호, pp.261-273, 1997.