Optimum Construction Duration for Road Tunnel Excavation Works

도로터널 굴착공사의 적정공기 판단기준

  • 김하나 ((주)SK종합건설) ;
  • 김대영 (부산대학교 건축공학과) ;
  • 김대영 (경남대학교 건축공학과) ;
  • 정성춘 (한국산업안전보건공단 산업안전보건연구원) ;
  • 허영기 (부산대학교 건축공학과)
  • Received : 2017.08.10
  • Accepted : 2018.02.07
  • Published : 2018.04.30

Abstract

Construction schedule acceleration due to unreasonable construction planning frequently leads to construction accidents. In order to avoid such inevitable acceleration and to ensure safety in construction sites, there is a need for objective standards to determine appropriate construction duration for each construction process earlier in the process. In order to achieve the goal, intensive experts interviews were firstly conducted to identify candidate drivers affecting construction schedule of road tunnel excavation works. Then, a total of 34 field data was collected from on-going sites to analyze. It was found that actual excavation length per one day on site is varied mostly by Rock Mass Rating(RMR) types from various statistical analyses. Therefore an one-way table of excavation length per a day by RMR types were presented in a form of percentile. The results will help industry experts determine the most appropriate construction schedule for the works, which eventually lead to a zero accident site in many ways.

Keywords

Acknowledgement

Supported by : 산업안전보건연구원

References

  1. Chan, DWM., & Kumaraswamy, MM. (1997). A comparative study of causes of time overruns in Hong Kong construction projects, International Journal of Project Management, 15(1), 55-63. https://doi.org/10.1016/S0263-7863(96)00039-7
  2. Cho, GC. (2012). Tunnel excavation methods suitable for reduction of construction period. Korean Society of Civil Engineers Magazine, 60(11), 30-39.
  3. Han, SH., Yoon, SM., & Lee, SH. (2006). Exploring delays of the mega construction project : the case of Korea high speed railway. KSCE Journal of Civil Engineering, 26(5), 839-848.
  4. Mehdizadeh, R., Breysse, D., Taillandier, F., & Niandou, H. (2011). Advanced methodology of risk breakdown structure developing for risk management of tunneling and construction projects. Proceeding of the 29th congress of AUGC.
  5. No, SL., Noh, SH., Lee, SP., & Seo, JW. (2006). Construction of long and large twin tube tunnel in Korea - Sapaesan tunnel. Tunnelling and Underground Space Technology, 21(3), 393. https://doi.org/10.1016/j.tust.2005.12.204