Intermediate Storage Process required before Operation Site Installation of System (Focusing on the Rolling Stock of Railway System)

시스템의 운용 현장 설치 전 요구되는 중간 보관 프로세스 연구 (철도차량 중심으로)

  • Received : 2020.12.03
  • Accepted : 2020.12.16
  • Published : 2020.12.31

Abstract

Due to the nature of the long-term project of a Railway business, Many problems have been arisen in the process of delivering products or systems verified by suppliers to the customer's operation site. Unexpectedly, it is often necessary for the verified products to store intermediately at the supplier's site for a variety of reasons, such as delays in business and delays in civil engineering, at the time of sending them to the customer's operation site. In this study, the intermediate storage process for finding and solving problems related to intermediate storage was presented focusing on the Rolling Stock of Railway System by reference to ISO/IEC/IEEE 15288:2015. A suitable intermediate storage process based on the developed product or system's characteristics will allow the verified products or systems to be placed on the customer's operation site and to meet the customer's product or system requirements.

Keywords

References

  1. 정홍식, 해외건설프로젝트에서 동시발생 공기지연, 한국비교사법학회지, 제21권 제2호, pp. 827-864, 2014.
  2. 김홍신, 도시철도차량 임시보관을 위한 신뢰성 기반유지보수 방안에 관한 연구, 석사학위 논문, 아주대학교(시스템공학과), 2012.
  3. ISO/IEC/IEEE 15288, Systems and software engineering - System life cycle processes, ISO/IEC/IEEE, pp. 72-74, 2015.
  4. INCOSE HANDBOOK 4th Edition, A Guide for System life cycle process and activities, INCOSE, pp. 88-89, 2015.
  5. 국토교통과학기술진흥원, 해상 이동형 해수담수화 플랜트 기술개발 기획, 국토교통부, p. 88, 2017.
  6. KFS 411, 변압기 방호 기준, 화재보험협회, p. 18, 2019.
  7. 최요철 외 1, 철도차량 동적보관프로세스에 관한 연구, 한국시스템엔지니어링학회 추계학술대회, 2018. 10.