DOI QR코드

DOI QR Code

Cohort-based evacuation time estimation using TSIS-CORSIM

  • Park, Sunghyun (Department of Nuclear Engineering, Hanyang University) ;
  • Sohn, Seokwoo (Department of Nuclear Engineering, Hanyang University) ;
  • Jae, Moosung (Department of Nuclear Engineering, Hanyang University)
  • Received : 2020.02.19
  • Accepted : 2020.11.29
  • Published : 2021.06.25

Abstract

Evacuation Time Estimate (ETE) can provide decision-makers with a likelihood to implement evacuation of a population with radiation exposure risk by a nuclear power plant. Thus, the ETE is essential for developing an emergency response preparedness. However, studies on ETE have not been conducted adequately in Korea to date. In this study, different cohorts were selected based on assumptions. Existing local data were collected to construct a multi-model network by TSIS-CORSIM code. Furthermore, several links were aggregated to make simple calculations, and post-processing was conducted for dealing with the stochastic property of TSIS-CORSIM. The average speed of each cohort was calculated by the link aggregation and post-processing, and the evacuation time was estimated. As a result, the average cohort-based evacuation time was estimated as 2.4-6.8 h, and the average clearance time from ten simulations in 26 km was calculated as 27.3 h. Through this study, uncertainty factors to ETE results, such as classifying cohorts, degree of model complexity, traffic volume outside of the network, were identified. Various studies related to these factors will be needed to improve ETE's methodology and obtain the reliability of ETE results.

Keywords

Acknowledgement

This work was supported by the Nuclear Safety Research Program through the Korea Foundation Of Nuclear Safety (KOFONS), granted financial resource from the Multi-Unit Risk Research Group (MURRG), Republic of Korea (No. 1705001).

References

  1. U.S. Nuclear Regulatory Commission, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, NUREG-0654/FEMA-REP-1 Rev.1, 1980.
  2. U.S. Nuclear Regulatory Commission, Criteria for Development of Evacuation Time Estimate Studies, NUREG/CR-7002/SAND2010-0016P, 2011.
  3. Jeon Young, A Study of the Evaluation Methodology for Radiological Emergency Planning Zone of Nuclear Power Plants, in: Doctoral Dissertation, Hanyang University, 2004.
  4. Korea Electric Power Research Institute, Development of Evacuation Time Estimation Methodologies within EPZ, 2005.
  5. Korea Hydro & Nuclear Power Co, Ltd, Analysis of Traffic Environment Around Nuclear Power Plants and Evacuation Time Estimate, 2014.
  6. Janghee Lee, et al., An estimated evacuation time for the emergency planning zone of the kori nuclear site, with a focus on the precautionary action zone, J. Rad. Protect. Res. 41 (3) (2016) 196-205. https://doi.org/10.14407/jrpr.2016.41.3.196
  7. Michael K. Lindell, An overview of protective action decision-making for a nuclear power plant emergency, J. Hazard Mater. 75 (2000) 113-129. https://doi.org/10.1016/S0304-3894(00)00175-8
  8. Thomas Urbanik II, Evacuation time estimates for nuclear power plants, J. Hazard Mater. 75 (2000) 165-180. https://doi.org/10.1016/S0304-3894(00)00178-3
  9. Department of nuclear safety of Busan, Action Manual for a Radiation Emergency, 2018, 52-3400000-000041-10.
  10. Department of nuclear and industrial safety of Ulsan, Action Manual for a Radiation Emergency, 2016.
  11. Department of safety of Yangsan, Action Manual for a Radiation Emergency, 2017.
  12. Smr Regulators Forum Working Group, SMR Regulators' Forum Pilot Project Report: Report from Working Group on Emergency Planning Zone, 2018.
  13. IAEA, Actions to Protect the Public in an Emergency Due to Severe Conditions at a Light Water Reactor, 2013.
  14. U.S. Nuclear Regulatory Commission, Severe Accident Risks: an Assessment for Five U.S. Nuclear Power Plants, vol. 2, NUREG-1150, 1990.
  15. U.S. Nuclear Regulatory Commission, State-of-the-Art Reactor Consequence Analyses Project Volume 1: Peach Bottom Integrated Analysis, vol. 1, NUREG/CR-7110, 2013. Rev. 1.
  16. U.S. Nuclear Regulatory Commission, Review of NUREG-0654, Supplement 3, "Criteria for Protective Action Recommendations for Severe Accidents, NUREG/CR-6953, 2007, 1/SAND2007-5448P.
  17. U.S. Nuclear Regulatory Commission, Development of Evacuation Time Estimate Studies for Nuclear Power Plants, NUREG/CR-6863/SAND2004-5900, 2004.
  18. Korean statistical informative service[website], Nov 30, http://kosis.kr/index/index.do, 2018.
  19. M.C. Trans, CORSIM-user Guide, 2011.
  20. Oak Ridge National Laboratory, OREMS Version 2.60, 2003.
  21. Busan Municipal Office, Vehicle Speed Survey Results, 2018.
  22. KLD Engineering, P.C, Indian Point Energy Center Development of Evacuation Time Estimates, KLD TR-537, 2012.