과제정보
본 연구는 국토교통부/국토교통과학기술진흥원의 지원으로 수행되었음(과제번호 22ORPS-B158109-03). 이 논문은 2022년도 광운대학교 우수연구자 지원 사업에 의해 연구되었음.
참고문헌
- Abanda, F.h., Tah, J.h.m., and Cheung, F.k.t. (2017). "BIM in off-Site Manufacturing for Buildings." Journal of Building Engineering, 14, pp. 89-102. https://doi.org/10.1016/j.jobe.2017.10.002
- Allied Market Research. (2021). Offsite Construction Market by Material, Construction Type and Application: Global Opportunity Analysis and Industry Forecast, 2021-2030.
- Barlow, J., Childerhouse, P., Gann, D., Hong-Minh, S., Naim, M., and Ozaki, R. (2003). "Choice and delivery in housebuilding: Lessons from Japan for UK housebuilders." Building Research and Information, 31(2), pp. 134-145. https://doi.org/10.1080/09613210302003
- Blismas, N.G., and Wakefield, R. (2009). "Drivers, constraints and the future of offsite manufacture in Australia." Constr Innov., 9(1), pp. 72-83. https://doi.org/10.1108/14714170910931552
- Choi, J.O. (2014). "Links between modularization critical success factors and project performance." The University of Texas at Austin.
- Choi, J.O., and O'Connor, J.T. (2014). "Modularization critical success factors accomplishment: Learning from case studies." Construction Research Congress, pp. 1636-1645.
- Choi, J.O., O'Connor, J.T., and Kim, T.W. (2016). "Recipes for cost and schedule successes in industrial modular projects: qualitative comparative analysis." Journal of Construction Engineering and Management, 142(10), 04016055.
- Haas, C.T., and Fagerlund, W.R. (2002). Preliminary research on prefabrication, pre-assembly, modularization and offsite fabrication in construction. Austin, TX. Retrieved from https://smartech.gatech.edu/handle/1853/10883
- Hwang, B.G., Shan, M., and Looi, K.Y. (2018). "Knowledge-based decision support system for prefabricated prefinished volumetric construction." Autom Constr., 94, pp. 168-178. https://doi.org/10.1016/j.autcon.2018.06.016
- Ismail, F., Yusuwan, N.M., and Baharuddin, H.E.A. (2012). "Management factors for successful IBS projects implementation." Procedia - Social and Behavioral Sciences, 68, pp. 99-107. https://doi.org/10.1016/j.sbspro.2012.12.210
- Jung, S.Y. (2022). "DfMA Assessment Model for Selecting Optimum Design in OSC projects." Ph.D thesis, Kwangwoon University.
- Jung, S.Y., and Yu, J.H. (2021). "A Study on the Critical Success Factors of Off-Site Construction through Keyword Frequency Analysis - A Literature Review of Overseas Research -" Korean Journal of Construction Engineering and Management, KICEM, 22(1), pp. 13-26.
- Kamar, K.A.M., Alshawi, M., and Hamid, Z.A. (2009). "Industrialised building system: The critical success factors. 9th international postgraduate research conference (IPGRC)" Salford: University of Salford, pp. 485-497.
- Korea Institute of Civil Engineering and Building Technology. (2020). "Policy Issues for the Revitalization of Precast Concrete Apartment Housing" KICT Insight 10.
- Lau, A.K.W. (2011). "Critical success factors in managing modular production design: Six company case studies in Hong Kong, China, and Singapore." Journal of Engineering and Technology Management, 28(3), pp. 168-183. https://doi.org/10.1016/j.jengtecman.2011.03.004
- Lawson, R.M., Ogden, R.G., and Bergin, R. (2011). "Application of modular construction in high-rise buildings." Journal of Architectural Engineering, 18, pp. 148-154. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000057
- Lessing, J., Stehn, L., and Ekholm, A. (2005). "Industrialised housing: Definition and categorisation of the concept." Proceedings of the in the 13th annual conference in the international group for lean construction, Sydney, pp. 471-480.
- Martilla JA, James JC. (1977). "Importance-performance analysis" J.Mark., 41(1), pp.77-79. https://doi.org/10.1177/002224297704100112
- Murtaza, M.B., Fisher, D.J., and Skibniewski, M.J. (1993). "Knowledgment-based approach to modular construction decision support." J Constr Eng Manag., 119(1), pp. 115-130. https://doi.org/10.1061/(ASCE)0733-9364(1993)119:1(115)
- O'Connor, J.T., O'Brien, W.J., and Choi, J.O. (2015). "Standardization strategy for modular industrial plants." J Constr Eng Manage., 141(9), 04015026.
- Park, N.J. (2009). "More effective application of importance-performance analysis in the case of cyber lecture." Journal of the Korean Data & Information Science Society, 20(2), pp. 329-338.
- Pan, W., Gibb, A.G.F., and Dainty, A.R.J. (2007). "Perspective of UK housebuilders on the use of offsite modern methods of construction." Constr Manage Econ., 25(2), pp. 183-194. https://doi.org/10.1080/01446190600827058
- Pan, W., Gibb, A.G.F., and Dainty, A.R.J. (2008). "Leading UK housebuilders' utilization of offsite construction methods." Building Research and Information, 36(1), pp. 56-67. https://doi.org/10.1080/09613210701204013
- Son, J.W., and Lee, J.S. (2019). "Off-Site Construction: Innovation in Construction Production System." Construction Engineering and Management, 20(5), pp. 3-7.
- Vrijhoef, R., Cuperus, Y,. and Voordijk, H. (2002). Exploring the Connection between Open Building and Lean Construction: Defining a Postponement Strategy for Supply Chain Management in Proceedings IGLC-10 Gramado, Brazil.
- Wang, Z., Hu, H., Gong, J., Ma, X., and Xiong, W. (2019). "Precast supply chain management in off-site construction: A critical literature review." Journal of Cleaner Production, 232, pp. 1204-1217. https://doi.org/10.1016/j.jclepro.2019.05.229
- Wuni, I.Y., and Shen, G.Q. (2019). "Critical success factors for modular integrated construction projects: a review." Build Res Inform., pp. 1-22.
- Wuni, I.Y., and Shen, G.Q. (2020). "Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle." Engineering, Construction and Architectural Management, 27(9), pp. 2315-2333. https://doi.org/10.1108/ECAM-10-2019-0534
- Wuni, I.Y., Shen, G.Q., and Osei-Kyei, R. (2020). "Quantitative evaluation and ranking of the critical success factors for modular integrated construction projects." International Journal of Construction Management, 22(11), pp. 2108-2120.