• Title/Summary/Keyword: 사장교

Search Result 349, Processing Time 0.039 seconds

Analysis of Construction Cost of the Second-Dolsan Bridge and the Sepung Bridge (제2돌산대교와 세풍대교의 공사비 분석)

  • Seo, Young-Jae;Lee, Kyoung-Jae;Kim, Jae-Hong
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.21-22
    • /
    • 2010
  • Recently, many concrete cable-stayed bridges are under construction for economic benefits. This study deals with analyzing construction cost of the Second-Dolsan Bridge and the Sepung Bridge as examples of concrete cable-stayed bridges.

  • PDF

Regularization Length in Single Plane Cable-stayed Concrete Bridge (1면 케이블 콘크리트 사장교의 응력 불균일 영역길이)

  • Kang, Ho-Jun;Jang, Jae-Youp;Kim, Gwang-Soo;Lee, Hwan-Woo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.10-13
    • /
    • 2010
  • 세그먼트 자중 등에 의한 휨모멘트와 케이블 수직압축력에 의한 합성응력이 발생되고 바닥판 경간비가 변하는 사장교의 시공단계에서는 전단지연의 영향범위가 다를 수 있다. 이 연구에서는 1면 케이블 콘크리트 박스 사장교를 대상으로 시공단계시 보강형에 고려되어야 할 합성응력에 의한 유효플랜지폭을 분석하였다. 그 결과 바닥판 경간비가 0.38 이하의 범위에서 보강형의 전폭을 유효플랜지폭으로 적용할 수 있는 것으로 해석되었다. 따라서 시공단계시 변화되는 바닥판 경간비의 크기에 관계없이 전폭을 유효플랜지폭으로 반영하는 실무관행은 안전측 설계가 되지 못할 수 가 있다. 바닥판 경간비가 작아짐에 따라서는 전폭과 캔틸레버 구조계로 유효플랜지폭을 결정하는 것이 타당하다. 이 연구에서는 수직력에 대한 도로교설계기준의 유효플랜지폭 규정에 대한 평가도 수행하였다.

  • PDF

A Study on Cost-Effectiveness Evaluation and Optimal Design of ant dampers for Cable-Stayed Bridges (사장교에 장착된 MR 댐퍼의 비용효율성 평가 및 최적설계 연구)

  • Park, Won-Suk;Hahm, Dae-Gi;Koh, Hyun-Moo;Park, Kwan-Soon
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.10 no.6 s.52
    • /
    • pp.47-56
    • /
    • 2006
  • A method is presented for evaluating the economic efficiency of a semi-active magneto-rheological (MR) damper system for cable-stayed bridges under earthquake loadings. An optimal MR damper capacity maximizing the cost-effectiveness is estimated for various seismic characteristics of ground motion. The economic efficiency of MR damper system is addressed by introducing the life-cycle cost concept. To evaluate the expected damage cost, the probability of failure is estimated. The cost-effectiveness index is defined as the ratio of the sums of the expected damage costs and each device cost between a bridge structure with the MR damper system and a bridge structure with elastic bearings. In the evaluation of cost-effectiveness, the scale of damage cost is adopted as parametric variables. The results of the evaluation show that the MR damper system can be a cost-effective design alternative. The optical capacity of MR damper is increased as the seismic hazard becomes severe.

A Study on Controlling the Negative Reaction of Cable Stayed Bridge Considering Constructability and Economy : Vam Cong Cable Stayed Bridge in Vietnam (시공성 및 경제성을 고려한 사장교 부반력 제어 연구 : 베트남 밤콩 사장교 사례)

  • Lee, Yong-Jin;Lho, Byeong-Cheol;Kim, Chang-Kyo;Bae, Sang-Woon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.5
    • /
    • pp.87-95
    • /
    • 2014
  • Cable stayed bridge is supported by cables and the negative reaction occurs by cables at anchor pier. To solve this problem, the proper side span ratio and the negative reaction measure of anchor pier are needed. And structural system of cable stayed bridge is determined by solution of the negative reaction as installation of the intermediate pier, counterweight and so on. In feasibility study, Vam Cong bridge was planned as 5 span cable stayed bridge. However, it was changed to 3 span cable stayed bridge in detailed design because of constructability and economy. The intermediate pier was excluded in order to improve the constructability, and side span ratio increased to control the negative reaction. As a result, Vam Cong bridge secure constructability, structural safety, and efficiency.

Determination of an Optimum Initial Cable Tension Force for Cable-Stayed Bridges using the Least Square Method (최소자승법을 이용한 사장교의 적정 케이블 장력 결정)

  • Park, Yong Myung;Cho, Hyun Jun
    • Journal of Korean Society of Steel Construction
    • /
    • v.17 no.6 s.79
    • /
    • pp.727-736
    • /
    • 2005
  • This study presents a method of determining the optimum cable tension forces for the proper initial equilibrium state of a cable-stayed bridge using the least square method. The proposed method minimizes the errors, i.e., the differences, such as the deflection and the moments of the girder and the tower, between the target values from a continuous beam by considering the cable anchor point as supports of the girder and the responses obtained from the analysis of the entire cable-stayed bridge system. Especially, the proposed method can selectively control the adjustment of the tower moment, the girder moment, and the deflections by introducing the weighing matrix. Through numerical analysis and comparisons with existing studies, the usefulness and validity of the proposed method was verified.

Damage Detection in Cable-Stayed Bridges Using Vibration Modes (진동모드를 이용한 사장교의 손상 검색)

  • Kong, Min-Sik;Ka, Hoon;Son, Seok-Ho;Yhim, Sung-Soon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.10 no.6
    • /
    • pp.113-123
    • /
    • 2006
  • As Cable-stayed bridges were constructed to the long span, they have become bigger and had weaknesses to vibration induced by earthquake, wind and vehicle loads. Structural damages induced by these loads affect the characteristic of vibration modes of structure. Damage detection of cable-stayed bridges by using existing safety diagnosis is difficult to detect the characteristic change of overall structural action. Also it requires very much time and cost. So in this study, the investigation of characteristic change of structural action and the detection of structural damages is analyzed by using characteristic properties of vibration mode before and after structural damage.

Semiactive Control of Cable-Stayed Bridges Using Full-Scale MR Fluid Dampers (실제규모의 자기유변 유체 감쇠기를 이용한 사장교의 진동제어)

  • Jung, Hyung-Jo;Park, Kyu-Sik;Ko, Man-Gi;Lee, In-Won
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2002.03a
    • /
    • pp.443-450
    • /
    • 2002
  • 본 논문에서는 미국토목학회(ASCE)의 사장교에 대한 첫번째 벤치마크 문제를 이용하여 제어-구조물 상호작용을 고려한 새로운 반능동 제어 기법을 제안하였다. 이 벤치마크 문제에서는 2003년 완공 예정으로 미국 Missouri 주에 건설 중인 Cape Girardeau 교를 대상 구조물로 고려하였다. Cape Girardeau 교는 New Madrid 지진구역에 위치하고, Mississippi 강을 횡단하는 주요 교량이라는 점 때문에 설계단계에서부터 내진 문제에 대하여 자세하게 고려되었다. 상세 설계 도면을 기반으로 하여 교량의 전체적인 거동 특성을 정확하게 나타낼 수 있는 3차원 모델이 만들어졌고, 사장교의 제어 성능에 관련된 평가 기준이 수립되었다. 본 연구에서는 제어 가능한 유체 감쇠기에 속하는 MR 유체 감쇠기를 제어 장치로 제안하였고, 기존 연구에서 MR 유체 감쇠기를 포함한 구조물의 제어에 효율적이라고 검증된 clipped-optimal 알고리듬을 제어 알고리듬으로 사용하였다. 또한, 실제 규모의 MR 유체 감쇠기 실험 결과를 이용하여 수치해석에 이용할 수 있는 동적 모델을 개발하였다. MR 유체 감쇠기는 제어 가능한 에너지 소산장치이며 구조물에 에너지를 가하지 않기 때문에 제안된 제어 기법은 한정입출력 안정성이 보장된다. 수치해석을 통해, MR 유체 감쇠기를 이용한 반능동 제어 기법이 사장교의 응답 감소에 효과적인 방법임을 증명하였다.

  • PDF

Initial Equilibrium Configuration Analysis for Bridges Supported with Stayed and Suspended Cables (사장-현수 복합케이블 교량에 대한 초기평형상태 해석)

  • Kim, Kyu-Hwan;Kim, Ho-Kyung;Lee, Hae-Sung
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.76-77
    • /
    • 2011
  • 본 논문에서는 새로운 케이블 교량 형식인 사장-현수 복합케이블 교량 형식에 대한 초기평형상태 해석방법을 제시한다. 구체적으로 복합케이블 교량의 해석방법으로 다음과 같은 두 가지 방법을 제안한다. 우선 사장교의 초기평형상태 해석에서 사용된 전체 구조물을 하나의 구조물로 생각하여 해석하는 일괄방식 해석방법을 제안한다. 이 방법을 적용하는 과정에서 행어부문의 거동이 기존의 가정에 위배되는 문제점이 발견되었는데, 이러한 문제점은 변위복원방식의 successive iteration 을 적용하여 해결하였다. 다음으로 현수교의 초기평형상태 해석에서 사용된 전체 구조물을 현수교 부문과 사장교 부문 그리고 행어 부문의 3가지 부문으로 분리하여 해석하는 분리방식 해석방법을 제안한다. 이 방법을 적용하는 과정에서는 위의 일괄방식 해석방법에서 나타난 행어의 거동이 기존의 가정에 위배되는 현상과 더불어, 분리된 각 부문의 평형 조건과 적합조건이 일치하지 않는다는 문제점이 발생하였다. 이러한 추가의 문제점은 타워 최상단부의 수평변위를 적절히 구속시키고 각 부문 해석의 초기값을 조절하여 해결하였다. 마지막으로 제안된 두 가지 방법을 Deck에 캠버가 있는 적절한 예제를 통해서 검증하였다.

  • PDF

Study on numerical analysis for cable anchorage device of arch type cable stayed bridge for light railroad (경전철용 아치형 사장교의 보강형 정착구에 대한 수치해석 연구)

  • Kong, Byung-Sueng;Jeong, Ji-Chan
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.619-622
    • /
    • 2011
  • 케이블 정착구 검토를 위해서 사장교 전 체계를 모델링하는 것은 전체모델링 해석시 많은 노력과 시간이 요구되고 해석결과의 분석 또한 어려움이 많다. 따라서 문제가 예상되는 부분만을 국부 상세해석하여 구조적 거동을 정확히 파악하는 것이 필요하다. 케이블 정착부에는 여러 보강재들로 구성되어 있어 국부해석에 어려움이 있다. 따라서 실제와 가능한 한 근접하도록 모델링을 하고 전체 구조물의 거동을 국부 상세모델에 적적히 반영할 수 있도록 경계조건을 설정하는 것이다. 본 논문에서는 부산 지하철 4호선의 아치형 사장교를 국내 범용 구조해석 프로그램인 MIDAS/CIVIL을 이용하여 아치리브와 거더정착구 모델링을 실시하였다. 해석 후 해석의 타당성을 검토하고 정착부의 안전성을 확보할 수 있는지 검토 분석 하고자 한다.

  • PDF

Experimental Study for Ultimate Behavior of Steel Cable Stayed Bridge Under Construction (실험을 통한 시공 중 강사장교의 극한거동 연구)

  • Lee, Kee Sei;Kim, Seung Jun;Choi, Jun Ho;Kang, Young Jong
    • Journal of Korean Society of Steel Construction
    • /
    • v.24 no.6
    • /
    • pp.683-692
    • /
    • 2012
  • The girders of cable stayed bridge are subjected to not only the bending moments but also additional compressive axial forces due to the horizontal components of cable forces. Because of these axial forces, the stiffness of girder can be decreased, and this problem should be considered especially for under-construction model rather than the full model. Korean domestic design specification suggests the linear elastic eigen value analysis for the stability problem of cable stayed bridges. However, this method cannot be applied to the under construction model because various geometric nonlinear characteristics cannot be considered. Therefore, in this study, 3 models which are assumed to be constructed by balanced cantilever will be considered experimentally and analytically to analyze the behavior of steel cable stayed bridges.