The Case Study of Qualification Assurance for Instrumentation and Control in Nuclear Power Plant

계측제어 기기의 현장적용을 위한 품질보증 사례

  • Published : 2002.07.10

Abstract

This paper describes QA methodologies for developed TBN control system that will be applied to nuclear power plants. The details are the development of QA Manual, QA Procedures, Equipment Qualification Procedure, Commercial Grade Items Dedication, and Software Verification & Validation Plan.

Keywords