The Study of FUSE Installing of PT in the trend of Digitalization and Convergence of Power Machinery.

디지탈화 및 복합화된 전력기기 변성기용 퓨즈 설치의 문제점

  • Ok Yeon Ho (Energy Business Dept. Korea Water Resource Corporation) ;
  • Lee Hyoung Mook (Energy Business Dept. Korea Water Resource Corporation) ;
  • Hong Yeong Jae (Energy Business Dept. Korea Water Resource Corporation) ;
  • Lee Eun Woong (Chungnam National University Engineering)
  • Published : 2004.07.14

Abstract

Fuse is the initial equipment of Protective Relay The installation standard of Fuse has been used for long time in Power Facilities. However according to the innovative development of Electric & Electronic element(=semiconductor) Technology, Protective Relay and other Power Equipments are being changed into Digitalization and Multi-Functional Convergence. In contrast with it, the installation standard of Fuse is just the same. There is a need to give careful consideration to it. This study will bear a Part of producing a safe and efficient Power by examining the current installation of primal 8f secondary 1'use in multi-functional PT of Power plant, giving a problem careful consideration and suggesting suitable countermeasures.

Keywords