Construction of Aluminum Curtain Wall with 3D Elevation for TRUTEC Building

트루텍 빌딩의 3차원 입체 커튼월 시공

  • Published : 2007.11.09

Abstract

TRUTEC building, which is located at DMC B block is zone, is just one the office building in Soeul. TRUTEC building is designed by Barkow Leibinger Architeken in Germany, has 5 stories under and 12 stories above and has been finished with the unique three dimensional curtain wall unit. Big trial to make unique elevation succeeded as getting rid of the typical plain curtain wall unit. In addition, aluminum bars are treated by the latest CNC machine in order to achieve 3D section. Construction of curtain wall is highly focused from the moment of contract to keep the schedule because the contract period is 18 months. Regular design meeting and technical meeting between stakeholders including construction manager, designer, engineer, consultant and so on have been held during the construction to minimize the risks from the unique elevation and trial. Step by step mock-up test (design mock-up and visual mock-up on site) has been performed before functional mock-up test.

트루텍(TRUTEC) 빌딩은 서울 마포구 상암동 DMC(Digital Media City) 단지 내에 위치한 오피스 빌딩이다. 본 건물은 독일 설계사무소의 원설계를 바탕으로 국내 실시설계가 이루어졌으며 지하 5층 지상 12층 중규모 건물로서 그 외관을 독특한 3차원 입체 유닛을 활용한 커튼월로 마감하였다. 기존의 커튼월 공사에서 보여주었던 평면적인 모델을 탈피하고 알루미늄 바를 3차원 입체 가공함으로써 사각형 박스의 단순하게 보여질 지 모르는 입면을 독특하게 구현해해는 데 성공했다. 18개월의 공기를 준수하기 위해 커튼월 공사는 공사계약시점부터 주요 공정으로 분리되어 공정관리가 이루어졌으며, 지속적인 공정 업데이트 및 유기적인 이해당사자 회의를 통해 디자인 현안들을 해결해 나갔다. 최초 시도되는 형태의 입면과 알루미늄 바의 가공방법에서 발생할 수 있는 리스크를 최소화하기 위하여 단계별 Mock-Up을 실시하였으며, 피드백을 통해 예상되는 문제점들을 도출하고 분석하였다. 이를 통해 촉박한 공기의 준수와 품질 확보를 이룰 수 있었다.

Keywords