Cost Estimating in Early Stage Using Parametric Method for Apartment Construction Projects

파라메트릭 방법(Parametric Method)을 이용한 사업초기 단계의 공사비 예측 방법

  • Published : 2008.11.07

Abstract

The importance of cost management in early stage has been increasing due to market change and competition severence in construction industry. Because the adjustable budget is only 20% after finishing design stage, the critical decision is made in the early stage. However, in the early stage, the design information is not enough to make crucial decision. Therefore, this research suggests the predicting method on the purpose of accurate cost estimation. The parametric estimation is appropriate for the early stage, especially it has the strength of rapidity in cost estimation. This research analyzes 84 actual data of public apartment on the scale of $11{\sim}15$ stories, and then performs the correlation analysis between cost and influence factors. After eliminating the parameters which causes the problem of multicollinearity, this research derived the formula through the multi-regression analysis.

국내 건설산업은 급격한 시장변화와 경쟁심화의 과정을 겪으면서 프로젝트 초기 단계의 예산 집행 및 관리의 중요성이 증가하고 있다. 설계 완료 이후의 단계에서 조정 가능한 비용은 20%에 불과하기 때문에, 프로젝트 초기 단계에서 중요한 의사결정이 이루어진다. 하지만 초기 단계에서의 의사결정은 설계정보가 확정되지 않고, 정보가 한정되는 등 불확실성 하에서 이루어진다. 이에 따라, 본 연구는 프로젝트 초기 단계의 정확한 비용 예측을 목적으로 parametric method를 사용하여 공사비 예측 방법을 제안하였다. Parametric method를 이용한 공사비 예측 방법은 프로젝트 초기단계에 사용하기에 적합하며, 특히 신속하게 공사비 예측을 할 수 있다는 장점을 지닌다. 국내 아파트 9개 단지 $11{\sim}15$층 규모의 총 84개동 공공아파트 실적자료를 분석하여 공사비와 영향요인간 상관관계 분석을 실시하였다. 다중공선성 문제를 야기하는 변수를 제거한 후, 다중회귀분석을 통하여 공사비 예측 관계식을 도출하였다.

Keywords