A Design and Case Study of a K-Stage BLU Inspection System for Achieving a Target Defective Rate

  • Yang, Moon-Hee (Department of Industrial Engineering, Dankook University)
  • Published : 2007.11.30

Abstract

In this paper, we address a design problem and a case study of a K-stage back-light-unit(BLU) inspection system, which is composed of K stages, each of which includes an inspection process and a rework process. Assuming the type I, II errors and the inspection-free policy for items classified as good, we determine the smallest integer of K which can achieve a given target defective rate. If K does not exist, holding the current values of the type I, II errors, we search reversely the defective rate of an assembly line and the defective rate of a rework process, to meet the target defective rate. Our formulae and methodology based on a K-stage inspection system could be applied and extended to similar situations with slight modification.

Keywords

References

  1. Avinadav, T. and T. Raz, "Economic optimization in a fixed sequence of unreliable inspections," Journal of Operational Research Society, 54 (2003), 605-613 https://doi.org/10.1057/palgrave.jors.2601543
  2. Jaraiedi, M., Kochhar, D. V., and S. C. Jaisingh, "Multiple Inspections to Meet Desired Outgoing Quality," Journal of Quality Technology, 19, 1 (1987), 46-51 https://doi.org/10.1080/00224065.1987.11979032
  3. Kim, T. K., A Case Study of Factory Innovation for BLU Manufacturing, Dankook University, Master Thesis, 2004
  4. Raz, T. and M. U. Thomas, "A Method for Sequencing Inspection Activities Subject to Errors." IIE Transactions, 15, 1 (1982), 12-18 https://doi.org/10.1080/05695558308974608