WBS Development for Acquisition and Analysis of public Housing Productivity Data (공동주택 생산성 데이터 수집/분석을 위한 WBS 개발)

  • Kim, Jae-Woo;Kim, Yea-Sang;Kim, Young-Suk;Kim, Sang-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.86-94
    • /
    • 2008
  • Productivity is one of key management indexes for evaluating soundness of a manufacturing organization and its efficiency. In many aspects of productivity management in the construction industry, however, intuition of an experienced field manager still plays a greater role while productivity data is not utilized efficiently for the construction management purposes, because the collection and analysis of the productivity-related information are not systematic. Lack of systematic method in collecting and analyzing the productivity data results in such problems. The existing WBS should therefore be improved to solve them. The authors developed a new WBS for productivity data collection and analysis by following the research direction that was determined by literature reviews, overseas cases, and interviews with field engineers. The new breakdown structure was then evaluated for its feasibility as a productivity analysis framework. It is expected that the productivity data collected by the WBS will be used for OLAP and mining for future productivity forecast.

A Comparative Analysis of Hindrance Factors to Labor Productivity in Each Construction Site Using the IPA (IPA를 이용한 건설 현장별 노동생산성 저해요인 비교)

  • Jeong, Jae-Ho;Lee, Suk-Won;Ahn, Byung-Ju;Jee, Nam-Yong;Kim, Jae-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.71-82
    • /
    • 2014
  • Korea's labor productivity in construction sites is dependent on experience and act in accordance with the human element of the construction workers. In order to increase the work productivity of the construction site that requires a strategic management to potentially hindrance factors of labor productivity. However, without considering the potential problems, management of labor productivity in prior studies is focused only on the immediate problems. The purpose of this study is to compare the site-specific analysis of labor productivity impediments using easy IPA to identify potential causes. As a result of the analysis was to identify the realistic problems of job insecurity and poor working conditions as well as economic problems. It is expected that it is possible to provide the basic data to strategy suggestions for long-term labor productivity improvement of the construction site.

An Approach on Life Cycle Based Efficiency Measurement in Construction Industry (건설 생산의 Life Cycle을 고려한 효율성 측정방안)

  • Jung Soon-Oh;Yoon Su-Won;Chin Sangyoon;Kim Yea-Sang;Park Ji-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.608-611
    • /
    • 2004
  • Efficiency of the construction process is one of the most important factors to project success. However efficiency is not well defined or measured in construction projects in general. More importantly, efficiency of the construction should be viewed through the life-cycle of the whole production system not in a single phase of the construction process. Therefore, this study defines the concept of efficiency and suggests the efficiency measurement model in construction. As a case study, the suggested model was applied to the curtain wall construction process of the high rise buildings as well.

  • PDF

A Comparative Analysis of Construction Labor Productivity in OECD Countries (OECD 국가의 건설업 노동생산성 비교 및 분석)

  • Park, Hwan-Pyo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.2
    • /
    • pp.175-185
    • /
    • 2023
  • Upon analyzing labor productivity in the construction industry across OECD countries, it was found that in 2019, labor productivity per employee in the South Korean construction industry was lower than that of major developed countries when adjusted for purchasing power parity(PPP). Specifically, when benchmarked against other countries at a base of 100, South Korea scored 76.9 in the United States, 88.4 in Japan, and 85.1 in the OECD average. Notably, South Korea ranked 25th in labor productivity per employee in the construction industry among 35 OECD countries in 2019, indicating a low standing. A comparative analysis of the construction market size and labor productivity in the construction industry across OECD countries revealed that larger construction markets did not necessarily correlate with higher labor productivity. To enhance labor productivity in the construction industry, this study proposed the active implementation of smart construction technology at construction sites and the promotion of on-site assembly work using off-site construction(OSC) technology, rather than traditional on-site labor. Moreover, it was recommended that the development of modular construction methods and technologies be expanded. In the future, if off-site production methods and modules are further developed through advanced robotics and factory automation, labor productivity is anticipated to increase due to the restructuring of production methods, such as manufacturing.

Towards a Transportation Support System for Off-site Construction : Identifying Key Functions and Diagramming Functional Blocks (오프사이트건설(Off-site Construction) 운반 시스템을 위한 핵심기능 도출 및 시스템 기능 전개도 개발)

  • Lee, Gangho;Kim, Minguk;Lee, Chansik;Koo, Choongwan;Kim, Taewan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.21-30
    • /
    • 2021
  • The existing construction industry is classified into industries with low productivity compared to other industries. In order to solve the decline in productivity in the construction industry, the world is focusing on off-site construction (OSC), which is about 40% more productive than existing construction methods. This high productivity is possible because the three stages of production, transport to the site, and site assembly are consistently maintained in a continuous flow. This study conducted a functional survey through literature review, preliminary field survey, questionnaire, and expert interview. The surveyed function were classified into five categories: convenience, flexibility, manageability, communication, and safety, and the functional characteristics of flexibility, manageability, and communication were high. Because of the change according to the construction progress, the production schedule of the factory, and the variety of transportation time required. Finally, A functional block diagram was developed based on the 15 functions corresponding with an average score of 4 or more in the surveyed function score result. If the OSC transport system is established through this study, It can contribute to a successful construction OSC project and increase productivity.

Datamodel for Productivity Management of Construction Project (건설공사 생산성 관리를 위한 데이터모델)

  • Ryu Han-Guk;Yu Jung-Ho;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.442-445
    • /
    • 2002
  • Construction delay claim occurs more often than any other claim. Delay claim impacts adversely the company's existence as well as the project's monetary problem. Because the calculation of the delay is not quantitative, owing not to have enough evidence, it is hard to solve evenly the delay claim. So, it is need to cumulate structurely the construction data or evidence during the construction. This study considers the established study about construction delay claim database and the problems and then presents the relation method between phase schedule and database. Finally, this study established the productivity claim database modeling for construction project through conceptual database modeling and logical database modeling based on information needed to make construction productivity database. So. the purpose of the study is to establish the datamodel for productivity management of construction project for calculating the delay days considering the lost productivity.

  • PDF

Using Next Generation Technologies to Resolve Construction Labor Shortage Problems (건설기능인력 수급 불균형 문제 해결의 대안 제시)

  • Lee, Bok-Nam;Woo, Sungkwon;Chang, Chul-Ki;Koo, Bon-Sang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.6D
    • /
    • pp.969-974
    • /
    • 2006
  • Labor shortages are a serious problem for Korea's construction industry. The problem is both quantitative and qualitative. There is a shortage in supply as due to a decrease in the influx of new labor, and existing workers are less productive as they age. The problem will only get worse as more and more major public projects are being planned. Options for increasing the labor supply are somewhat limited, and thus efforts need to be made to adopt new technologies that can improve the productivity and efficiency of field work and their processes. This paper introduces seven innovation technologies that have the best potential to increase productivity and thus reduce the burden of labor shortage problems. These include 1) Substitution by use of robotics and automation, 2) development and applications of Innovative materials to reduce on site field work, 3) increase in productivity through the implementation of Information Technology, 4) improved productivity through the application of modules, and prefabrication, 5) prevention of rework and redesign, 6) diversification of labor by integrating labor skills, and 7) improved productivity by standardizing site processes.

A Study on Management Responsibility about Factors that Influence the Productivity on Site - based on the Goneralcontractor's Questionnaire - (생산성을 저해하는 요소들에 대한 관리 책임에 관한 연구 - 원도급자 설문을 중심으로 -)

  • Chung Hee-Suk;Lee Tae-Sik;Park Jong-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.350-354
    • /
    • 2002
  • The industrial society today becomes competitive industry of high-development and advance. The notion of the productivity improvement in most of the industries becomes much more important in this situation. Furthermore, improvement in the productivity is the main pursuit of all industries, in order to overcome the recent economical crisis in korea and to strengthen our competitiveness in international industry. Therefore, the improvement of productivity becomes more crucial especially for the recent difficulties of domestic construction industry. From such a perspective, this study has three main objectives Identify positive and negative factors which affect construction productivity based on the analysis of questionnaires distributed to subcontractors.

  • PDF

Crew Productivity and Cost Analysis of Sandwich Panel Construction Work by Applying Web-Cyclone Simulation (Web-Cyclone을 활용한 샌드위치 패널공사 작업조별 생산성 분석 및 공사금액 예측에 대한 연구)

  • Cho, Dong-Ryul;Lee, Seung-Hyun;Son, Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.262-267
    • /
    • 2008
  • The domestic construction market started to expand steadily since 1970s. The building market which utilizes a sandwich panel with advantages of economical construction expenses and convenient construction has grown rapidly in recent years. However, the companies which specialize in constructing sandwich panels are relatively small or medium size, compared with other construction companies. As a result, studies on the improvement of productivity have not been conducted sufficiently. In this study, the construction sites of sandwich panel are investigated, and the work processes by each team are analyzed. Additionally, the productivity and the construction cost of each construction team are analyzed by constructing a model using the Web-Cyclone. It is expected that the results of this study can be applied to estimate the productivity and the construction cost of a sandwich panel construction that is appropriate for the on-site characteristics of small and medium sized construction companies in Korea. Also, similar processes can be simulated based on the modeling constructed in this study.

  • PDF